Burner Operating Sequence (Gas Operation) - Riello RLS 810/E FGR Installation, Use And Maintenance Instructions

Dual fuel gas oil/ gas burner
Table of Contents

Advertisement

4.13

Burner operating sequence (GAS OPERATION)

X07
X06
X10
X05
X08
X20+X21
FGR
X32
X33
X34
X04
X03
X01
X02
X25
X24
Key to layout (Fig. 7)
Any condition
t1
Waiting time for safety circuits consent
(boiler fuel)
t2
Opening time of the gas valve (with
sealing control active)
t3
Servomotor opening time
t4
Activation time FGR servomotor
t5
Pre-purge time
t6
Pre-ignition time
t7
Ignition flame safety time
t8
Flame stabilization time
nd
t9'
Safety time 2
t10
Modulation phase
t11
Adjustment time
t12
Opening time of the gas valve (with
sealing control active)
t13
Post-purge time
t15
Post-combustion time
t16
Checking time for flame extinction
t17
Checking time for gas valve (with seal-
ing control active)
20171988
Technical description of the burner
adjustable
adjustable
adjustable
stage
adjustable
adjustable
Key to layout (Fig. 7)
FGR
FGR release
X01
Gas valve 1
X02
Gas valve 2
X03
Pilot valve
X04
Ignition transformer
2.4 s
X05
Gas pressure > min.
X06
Gas safety circuit
30/60 s
X07
Boiler safety circuit
0 - t5
X08
Air pressure switch
X10
Burner ON
X20+X21 Flame signal
X24
Fault
3 s
X25
Fan ON
X32
Air servomotor
3 s
X33
Fuel servomotor
X34
FGR servomotor
3 s
5 s
30 s
Tab. H
14
GB
S9612
Fig. 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

20170200

Table of Contents