Information and general instructions Information and general instructions Information about the instruction manual 1.1.1 Introduction WARNING: MOVING PARTS The instruction manual supplied with the burner: This symbol indicates that you must keep limbs ➤ is an integral and essential part of the product and must not be away from moving mechanical parts;...
Information and general instructions 1.1.4 Delivery of the system and the instruction ➤ The system supplier must carefully inform the user about: – the use of the system; manual – any further tests that may be required before activating the When the system is delivered, it is important that: system;...
Safety and prevention Safety and prevention Introduction The burners have been designed and built in compliance with cur- the type and pressure of the fuel, the voltage and frequency of the rent regulations and directives, applying the known technical rules electrical power supply, the minimum and maximum deliveries for of safety and envisaging all the potential danger situations.
H. Note that if you need to examine the combustion head, the burner must be pulled backward on the slide bars and turned upward. D10233 Fig. 3 inch RLS 38/E - 13 32” 32” 4” 32”...
26. Model MBtu/hr RLS 38/E NOTE: RLS 50/E the firing rate areas given in Fig. 4 have been reduced by 10% with respect to the maximum range that can be reached.
Technical description of the burner Minimum furnace dimensions The firing rates were set in relation to certified test boilers. Example: Fig. 5 indicates the diameter and length of the test combustion output 1388 MBtu/hr: diameter 20 inch - length 4.9 ft. chamber.
Technical description of the burner 3.10 Control box for the air/fuel ratio (LMV36.5...) Warning notes To avoid injury to persons, damage to property or the environment, the following warning notes must be observed! WARNING The LMV36.5... is a safety device! Do not open, interfere with or modify the unit.
Page 15
Technical description of the burner Technical data LMV36.5... basic unit Mains voltage AC 120 V -15 % / +10 % Mains frequency 50 / 60 Hz ±6 % Power consumption < 30 W (typically) Safety class I, with parts according to II and III to DIN EN 60730-1 Terminal loading Unit fuse F1 (internally) 6.3 AT...
Page 16
Technical description of the burner Sequence diagrams Gas direct ignition «G», Operation «G mod», «Gmod pneu» Control thermostat or pressurestat (R) ON Air pressure switch (LP) Pressure switch - leakage test (P LT) POC (alternative to pressure switch-max (Pmax) Fan motor (M) Ignition transformer (Z) Fuel valve 1 (V1) Fuel valve 2 (V2)
Page 17
Technical description of the burner Light oil direct ignition «Lo», Operation «Lo mod», «Lo 2-stage», «Lo 3-stage» Control thermostat or pressurestat (R) ON Air pressure switch (LP) POC (alternative to pressure switch-max (Pmax) Fan motor (M) Ignition transformer (Z) Fuel valve 1 (V1) Fuel valve 2 (V2) Alarm (AL) 0°...
Page 18
Technical description of the burner Legend to sequence diagrams (Fig. 7 and Fig. 8) Valve proving takes place depending on the parameter: Between phase 62 and phase 70 or / and between phase 24 and phase 30 Parameter: Short / long preignition time for oil only Short / long oil pump –...
Technical description of the burner 3.11 Actuators (SQM33.5...) Warning notes To avoid injury to persons, damage to property or the environment, the following warning notes should be observed! WARNING Do not open, interfere with or modify the actua- tors! ➤ All activities (mounting, installation and service work, etc.) must be performed by qualified staff.
Boiler plate Drill the combustion chamber mounting plate as shown in (Fig. 10). The position of the threaded holes can be marked using the head gasket supplied with the burner. inch RLS 38/E 32“ 16“ RLS 50/E 32“ 16“...
The range of lengths available, L (inch), is as follows: the blast tube. For boilers having a water-cooled front the insulation 11)-12) is not Model required unless it is required by the boiler manufacturer. (short blast tube) (long blast tube) RLS 38/E “ “ RLS 50/E “ “ 4"...
Installation Burner refitting ➤ Refit the burner 4)(Fig. 16) to the slide bars 3) at approxi- ➤ secure the burner to the sleeve by tightening screw 1); mately 4” from the sleeve 5) - burner positioned as shown in ➤ connect the oil pipes again by screwing on the two connectors (Fig.
Installation 4.10 Hydraulic system Explosion danger due to fuel leaks in the presence of a flammable source. Precautions: avoid knocking, attrition, sparks and heat. Make sure that the fuel interception tap is closed before performing any operation on the burner. The fuel supply line must be installed by qualified personnel, in compliance with current standards D2596...
Installation 4.11 Hydraulic connections The pumps are equipped with a by-pass that connects return line and suction line. The pumps are installed on the burner with the by-pass closed by screw 6), see diagram Fig. 18 at page 22. It is therefore necessary to connect both hoses to the pump. The pump seal will be damaged immediately if it is run with the return line closed and the by-pass screw inserted.
A high fire ouput of 1704 MBtu/hr shown in Tab. K corresponds to D2545 4.45” WC pressure. This value serves as a rough guide, the effective delivery must be measured at the gas meter. ∆p (“ WC) RLS 38/E MBtu/hr Natural gas 3.46 3.58 Fig. 23 1098 3.70...
Installation 4.15 Electrical wiring Notes on safety for the electrical wiring ➤ The electrical wiring must be carried out with the electrical supply disconnected. ➤ Electrical wiring must be carried out by qualified personnel and in compliance with the regulations currently in force in the country of destination.
Start-up, calibration and operation of the burner Start-up, calibration and operation of the burner Notes on safety for the first start-up The first start-up of the burner must be carried out Check the correct working of the adjustment, com- by qualified personnel, as indicated in this manual mand and safety devices.
Start-up, calibration and operation of the burner Adjustments before first firing - gas operation Adjustment of the combustion head has been illustrated on page 26. In addition, the following adjustments must also be made: ➤ open manual valves down stream and up stream from the gas train.
Start-up, calibration and operation of the burner Burner start-up Feed electricity to the burner via the disconnecting switch on the 5.4.1 Adjusting gas/air delivery boiler panel. ➤ Move slowly towards the maximum output (but- Close the thermostats/pressure switches, set the parameters on terfly gas valve completely open);...
Start-up, calibration and operation of the burner Burner calibration - light oil operation Pump pressure It is advisable to first set the burner for opera- 174 PSI: this is the pressure calibrated in the factory which is usu- tion on oil and then for gas. ally sufficient for most purposes.
Start-up, calibration and operation of the burner Air pressure switch The air pressure switch is connected in differential (Fig. 33) and is activated by both the negative pressure of the air intake and the air pressure from the fan. Adjust the air pressure switch (Fig. 29) after having performed all other burner adjustments with the air pressure switch set to the min.
Maintenance Maintenance Notes on safety for the maintenance The periodic maintenance is essential for the good operation, safety, yield and duration of the burner. Disconnect the electricity supply from the burner by It allows you to reduce consumption and polluting emissions and means of the main switch of the system.
Page 34
Maintenance UV scanner Clean the glass cover from any dust that may have accumulated. In order to reach the UV scanner, unscrew the screw 1)(Fig. 36) and extract the flame sensor with the relevant support 2). D10440 Fig. 36 Combustion head Open the burner and make sure that all components of the com- bustion head are in good condition, not deformed by the high tem- peratures, free of impurities from the surroundings and correctly...
Maintenance Opening the burner 6.3.1 To close the burner To close the burner proceed sa follows: Disconnect the electrical supply from the burner by means of the main system switch. ➤ push the burner until it is about 4” from the sleeve; ➤...
Appendix - Burner start up report Appendix - Burner start up report Model number: Serial number: Project name: Start-up date: Installing contractor: Phone number: GAS OPERATION : Low Fire Gas Supply Pressure: High Fire : Low Fire Main Power Supply: High Fire Control Power Supply: CO: Low Fire...
Page 44
RIELLO S.p.A. I-37045 Legnago (VR) Tel.: +39.0442.630111 http:// www.riello.com RIELLO BURNERS NORTH AMERICA http://www.riello.ca 35 Pond Park Road 2165 Meadowpine Blvd Hingham, Massachusetts, Mississauga, Ontario U.S.A. 02043 1-800-4-RIELLO Canada L5N 6H6 Subject to modifications...