Installation - Abloy DB001 Installation Manual

Swing door operators
Table of Contents

Advertisement

INSTALLATION

Steps of installation
- Preparing installation
- Installing the mounting plate
- Mounting the operator and the arm
- Connecting the operator to mains
- Commissioning
- Testing
- Connecting impulse devices
Preparing installation
- Check the proper function of the door
- hinges
- door clearance
- Check the proper function of the lock
- lock case
- striker plate
Tools required
- Torx T8, T10, T20 and T25
- Metric hexagonal key 3, 4 and 6 mm
- Flatblade screwdriver, small
- Torque wrench with metric Allen socket 6 mm
Base material
Steel
Aluminium
Wood
8
Mount a door stop to the door open position so that wind will not drive
the door against the wall, resulting in damage
Minimum requirements of wall profile
5 mm
6 mm
50 mm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Db002

Table of Contents