Download Print this page

Eaton STS 2000A Installation And Operation Manual page 63

Static transfer switch 2000a 3-pole

Advertisement

Figure 19. Help for Bypass Operations
Help checklists guide an operator through the
steps of going to bypass. There are checklists for
going to Bypass 1 and 2 and returning to Normal
STS operation.
The process of going to bypass will normally
generate alarms, for example, change of breaker
status.
The Help panel indicates completion of the
procedure ("In Bypass 1").
The Status panel shows "Load on Bypass!!!"
Eaton Static Transfer Switch 2000A 3-Pole Installation and Operation Manual 164001127—Rev 01
Operational Modes
Touch Help.
Help overlays the Operator
and Transfers panels on the
Home screen.
47

Advertisement

loading