Download Print this page

Huawei EchoLife EG8143H5 Quick Start Manual page 5

Advertisement

EchoLife EG8143H5
Quick Start for QR code
Mounting an ONT onto the wall
1.
2.
3.
Issue 01 (2022-11-01)
NO TE
The appearance shown in this document may be different from the actual appearance of
the product. The actual product prevails.
Mark two positions with the same spacing as that between the two mounting
holes of the ONT using a marker on a wall.
Select a proper drill bit according to the outer diameter of the screws. Use a
hammer drill to drill the marked positions on the wall. Then clean the holes
and install two expansion bolts.
Use a screwdriver to fasten the screws into the expansion bolts, reserving 5
mm ends out of the wall, and mount the ONT onto the screws.
Copyright © Huawei Technologies Co., Ltd.
1 Placing the Device
2

Hide quick links:

Advertisement

loading