Honeywell MA-2000 Installation Manual page 47

Hide thumbs Also See for MA-2000:
Table of Contents

Advertisement

7
7
7
5.
Unscrews the 5 screws .
6.
Remove the main board + LCD lifting up using both hands.
Reinstallation
7.
Install the new main board + LCD on front door.
8.
Follow the instructions in this chapter in reverse order, then follow the preparation instructions in
chapter 11.1 in reverse order to step 8.
9.
Turn on the switch from the electrical cabinet to connect the main power to the panel.
10. Plug the battery cables to the batteries and close the front panel door with the 2 screws see chapter 11.1.
Recommissioning
After completing the recommissioning, perform a complete function test of the system!
M-167.1-MA2000-EN / 06.2022
7
7
MA-2000
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Morley-ias ma-8000

Table of Contents