1
1.
Door
2. Control Panel
3. Stainless Tub
4. Lint Filter
PART 3: INSTALLATION GUIDE
Pre-Installation Consideration
In order to avoid unnecessary fire, electric shock or personal injury
hazards, all electrical wiring and grounding must be set in accordance
with the national electrical standards. When preparing for installation,
ensure that your power supply is fused or equipped with circuit breakers
for 220V, 50Hz, 10A. To ensure your safety, you must use a three-core
socket and ensure that your socket is properly and reliably grounded.
Please install on a hard, flat, level floor (otherwise, abnormal vibration
and noise, or even malfunction may happened.).
PART 2: NAME OF PARTS
2
3
6
4
5
5. Front Ventilation
6. Power Cord
7. Reset Button
12
7
Need help?
Do you have a question about the ED 0810 UCWH and is the answer not in the manual?