Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized shutoff. The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure.
Page 3
S'il y à quelque chose qui ne va pas fait un rapport immédiatement. Date Signed Date Signed Datum Unterschrift Date Signed Date Signe Date Signed S24-197 www.bradleycorp.com (S19-125SFMBF only) 114-090 204-421 114-090 Bradley • 215-1568 Rev. D; ECN 15-05-010 3/31/2015...
Page 5
82" (2083mm) min. min. (635mm) min. 96" (2438mm) max. to floor 38" (965mm) 38" (965mm) to 48" (1219mm) to 48" (1219mm) from floor from floor Wall opening 6" (152mm) wide 10" (254mm) high Bradley • 215-1568 Rev. D; ECN 15-05-010 3/31/2015...
S19-125SBF, S19-125SFMBF Installation Installation Piping and Piping and adequate adequate supports by supports by installer installer S19-125SBF S19-125SFMBF NOTE: Use teflon tape only . NOTE: Use teflon tape only . Bradley • 215-1568 Rev. D; ECN 15-05-010 3/31/2015...
S19-125SBF, S19-125SFMBF Installation Connect Water Supply c o rp .c ra d le y w w w .b 11 4-0 90 To Showerhead Connect supply piping. 1" NPT supply line Bradley • 215-1568 Rev. D; ECN 15-05-010 3/31/2015...
Need help?
Do you have a question about the S19-125SBF and is the answer not in the manual?
Questions and answers