Mitsubishi Electric FREQROL HC Instruction Manual page 24

Transistorized inverter
Table of Contents

Advertisement

(2) Installation of the reactors 1, 2 and external box
Confirm the types.
Note the types of the reactor 1 (FR-HCL01) and
reactor 2 (FR-HCL02) look alike in outline.
Reactor 1 (FR-HCL01)
AC REACTOR
TYPE
FR-HCL01
BKO-CA
SERIAL
Reactor 2 (FR-HCL02)
AC REACTOR
TYPE
FR-HCL02
(Note)
BKO-CA
SERIAL
Note: For the reactor 1 (FR-HCL01) and reactor 2 (FR-
HCL02), check the "TYPE" in the above rating
plates.
Instructions for ambient temperatures
For adequate heat dissipation, leave sufficient
space around the reactor 1 (FR-HCL01) and
reactor 2 (FR-HCL02).
5cm or more
Install the equipment on a non-combustible
surface.
Install the reactor 1 (FR-HCL01) and reactor 2 (FR-
HCL02) on a non-combustible. Direct installation on
a combustible may cause a fire.
10cm or more
5cm or more
Avoid places where the equipment is subjected to
oil mist, flammable gases, fluff, dust, dirt, etc.
Install the equipment in a clean place or protect
them from suspended matter.
Bolt the reactors securely and horizontally.
(Note)
To prevent looseness, install the reactor 1 (FR-
HCL01) and reactor 2 (FR-HCL02) on a surface
securely and horizontally with screws or bolts.
Note:Avoid vertical or side installation and install
them on a mounting stand which can withstand
their weights.
Install the external box (FR-HCB) vertically.
Note:Install
it
installation may lead the external box to a
failure.
Note:Since the charged sections of the reactor 1,
reactor 2 and external box are uncovered, fully
protect them to prevent ground fault and
electric shock.
- 15 -
vertically.
Horizontal
or
side

Advertisement

Table of Contents
loading

Table of Contents