Zephyr Presrv PRKB24C01AG Use, Care And Installation Manual page 26

Kegerator and beverage cooler
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions
Built-In Kit Installation
Black Plastic
Insulation Cap
26
PRKB24C01AG & PRKB24C01AS-OD Use, Care, and Installation Guide
FIG. M
Air Conduit
FIG. N
2. Remove the black plastic insulation
cap from the kegerator and slide the
kegerator under the countertop and
plug it in (FIG. M). Do not power on the
kegerator yet.
3. Remove the air conduit from the beer line
cooling system inside the kegerator by
removing (2) screws (FIG. N).
4. Install the adjustable insulation tube
through the top of the countertop and
into the kegerator. Use the insulation tube
gasket to secure the insulation tube to the
ceiling of the kegerator using the included
(3) ST*12 screws shown in FIG. O.
NOTE: If you are using the built-in kit, there
is no need to install the black rubber flange
included with the tap kit. The rubber flange
that is part of the adjustable insulation tube
is sufficient to create a seal.
Adjustable
Insulation
Tube
Insulation Tube Gasket
FIG. O
P R E S R V ™
K E G E R ATO R &
B E V E R A G E C O O L E R
I N D O O R & O U T D O O R

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Presrv PRKB24C01AG and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Presrv prkb24c01as-od

Table of Contents