Download Print this page

Smf / Cm / Sta - Condari QASAIR H Series Installation & User's Instructions

Advertisement

INSTALLATION INSTRUCTIONS
• 3F
• SMF
• CM
• STA
Installation must be carried out by the procedure outlined.
Failure to do so may void the guarantee.
Electrical: Wiring to the appliance must comply with State and local Regulations.
Connection to be carried out by a registered electrician.
1. Prepare wall by marking level line at desired height above cooktop.
2. Plumb line from centre of cooktop to ceiling and mark flue cut out.
3. Mark level line for base of canopy 700-800mm above bench 750mm desirable.
4. Position mounting bracket on wall and fix with four screws.
5. Cut a neat hole through the ceiling and remove any obstructing timbers.
6. Note: Various offsets are available from your QASAIR dealer to duct around any major structural beams which
cannot be removed. Ask your QASAIR dealer for advice.
7. In the case of back ducted models, cut a hole in the wall at the desired height.
8. Locate solid fixing point in wall to support hood. If there is no solid fixing point it will have to be placed in the wall
before proceeding. QASAIR recommend at least four (4) fixing points.
9. Drill holes in back of unit at suitable fixing points.
10. Drill 20mm hole in the rear of unit for 240 volt power cable as close as possible to junction box or use hole below
the junction box.
11. Attach flue (if applicable), then carefully lift into position on level line. Ensure flue is pushed into position and
electrical cable is fed into rear of unit.
12. Duct in approved manner to outside atmosphere.
10
Recommended fixing points
Qasair Rangehoods Installation Instructions

Advertisement

loading