Connections On The Flue Gas Side - Viessmann VITOCROSSAL 200 CI2 Series Installation Instructions Manual

Table of Contents

Advertisement

Vitocrossal 200 CI2 Installation

Connections on the Flue Gas Side

Connecting the neutralizing system (accessories)
The condensate trap is equipped with a float. If
Note:
there is no water in the condensate trap, the float
closes it.
The drain F must be lower than the condensate trap.
Ensure there is an air gap around the condensate hose
E at the drain F to allow the condensate to flow
freely.
Legend
A Vitocrossal 200 CI2, 399 to 1000
B Condensate trap
C Neutralizing system (accessories)
D Condensate trap hose (included with the boiler) to
neutralizing system
E Drain hose
F Drain (on-site)
Legend
A Vitocrossal 200 CI2, 1500 to 2000
B Condensate trap (included with the boiler)
C Neutralizing system (accessories)
D Condensate trap hose (included with the boiler) to
neutralizing system
E Drain hose
F Drain (on-site)
For the CI2 1500 and 2000 if the neutralization unit is
placed on the same level as the boiler:
The inlet and outlet of the neutralization unit must be less
than 6a in. (160 mm) from the base of the neutralization
system to the bottom of the inlet/outlet to ensure proper
condensate drainage (refer to dimension A). If this height
is exceeded a condensate pump will be required.
Installation
C
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents