Gas Adjustments - Immergas EOLO Mini Technical Documentation Manual

Hide thumbs Also See for EOLO Mini:
Table of Contents

Advertisement

Technical documentation
Max and minimum gas pressure adjustments
can be made by means of the gas valve
respecting the values shown on the tables
relating to each boiler for the type of
corresponding gas.
After fitting a pressure gauge, connected to
the gas valve outlet and to the positive
pressure point on the top part of the sealed
chamber
(see
illustration
proceed as follows:
- VALVE VK 4105 M (with yellow protection cap)
Minimum pressure adjustment
-
After
interrupting
modulation coil, turn screw "3" clockwise
to increase pressure to the burner and
anticlockwise to decrease the pressure.
Maximum pressure adjustment
(to be done after minimum pressure
adjustment)
- Sample the d.h.w after setting the
temperature switch on maximum.
Turn nut "4" clockwise to increase the
pressure and anticlockwise to decrease the
pressure.
- VALVE SIT 845
Maximum pressure adjustment
- Sample the d.h.w. after setting the
temperature switch at maximum.
Turn nut "3" clockwise to increase the
burner
pressure
and
decrease it.
Minimum pressure adjustment
(to be done after maximum pressure
adjustment)
- After interrupting power to the
modulation
coil,
clockwise to increase burner pressure
and anticlockwise to decrease it.
STEME ed 7/03

GAS ADJUSTMENTS

alongside),
power
to
the
anticlockwise
to
turn
screw
"2"
1) Modulation coil
2) Coil pin
3) Min. output setscrew
4) Max output setscrew
1) Modulation coil
2) Minimum output setscrew
3) Maximum output setscrew
4) Gas valve outlet pressure point
5) Gas valve inlet pressure point
6) Protection cap
13
Technical documentation
5) Yellow protection cap
6) Gas valve outlet press. point
7) Vale inlet press. point
8) Air press. point
EOLO MINI

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents