Chapter 4: Installation; Step 1: Preparing The Site; Step 2: Installing The Switch; Table 4-1. Site Requirements - NETGEAR ProSafe GS716T Operating Instructions Manual

Gigabit smart switch
Hide thumbs Also See for ProSafe GS716T:
Table of Contents

Advertisement

CHAPTER 4: INSTALLATION

This chapter describes the installation procedures for your NETGEAR ProSafe GS716T Gigabit Smart Switch. Switch installation involves the
following steps:

Step 1: Preparing the site

Step 2: Installing the switch

Step 3: Checking the installation
Step 4: Connecting devices to the switch
Step 5: Installing an SFP GBIC module
Step 6: Apply AC power
Step 7: Switch management through a Web Brower or Utility Program (initial configuration)
Step 1: Preparing the Site
Before you install your switch, be sure your operating environment meets the operating environment requirements in Table 4-1.

Table 4-1. Site Requirements

Characteristics
Mounting
Desktop installations:
Rack-mount installations:
Access
Power source
Environmental
Temperature:
Operating humidity:
Ventilation:
Operating conditions:
Step 2: Installing the Switch
You can install your NETGEAR ProSafe GS716T Gigabit Smart Switch on a flat surface or in a standard 19-inch rack.
Installing the Switch on a Flat Surface
The switch ships with four self-adhesive rubber footpads. Stick one rubber foot pad on each of the four concave spaces on the bottom of the switch.
The rubber footpads cushion the switch against shock/vibrations. They also provide space between each stacked switch for ventilation.
Installing the Switch in a Rack
To install the switch in a rack, use the following procedure (and refer to Figure 4-1). To perform this procedure, you need the 19-inch rack-mount kit
supplied with your switch.
1.
Attach the supplied mounting brackets to the side of the switch.
2.
Insert the screws provided in the rack-mount kit through each bracket and into the bracket mounting holes in the switch.
3.
Tighten the screws with a #1 Phillips screwdriver to secure each bracket.
4.
Align the mounting holes in the brackets with the holes in the rack, and insert two pan-head screws with nylon washers through each bracket
and into the rack.
5.
Tighten the screws with a #2 Phillips screwdriver to secure the switch in the rack.
Requirements
Provide a flat table or shelf surface.
Use a 19-inch (48.3-centimeter) EIA standard equipment rack that is grounded and physically
secure. You also need the rack-mount kit supplied with your switch.
Locate the switch in a position that lets you access the front panel RJ-45 ports, view the front
panel LEDs, and access power connector.
Provide a power source within 6 feet (1.8 meters) of the installation location. Power specifications
for the switch are shown in Appendix C. Be sure the AC outlet is not controlled by a wall switch,
which can accidentally turn off power to the outlet and the switch.
Install the switch in a dry area, with ambient temperature between 0 and 40ºC (32 and 104ºF).
Keep the switch away from heat sources such as direct sunlight, warm air exhausts, hot-air vents,
and heaters.
The installation location should have a maximum relative humidity of 90%, non-condensing.
Do not restrict airflow by covering or obstructing air inlets on the sides of the switch. Keep at least
2 inches (5.08 centimeters) free on all sides for cooling.
Be sure there is adequate airflow in the room or wiring closet where you intend to install the
switch.
Keep the switch at least 6 ft (1.83 m) away from nearest source of electromagnetic noise, such as
a photocopy machine.
Page 14 of 20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs716tv1 - prosafe gigabit managed switch

Table of Contents