Floor Installation - Samsung AM FNCD Series Installation Manual

Ceiling/floor convertible type
Table of Contents

Advertisement

Floor installation

1. Select pipe directions.
When the directions are selected, drill 3-1/8'' (100mm, for pipe and
cables) and 1-3/4'' (40mm, for drain hose) diameter holes on the wall so
that it slants slightly downwards toward the outdoor for smooth water
flow.
• Use the pattern sheet to select pipe directions.
NOTE
2. Install the hanging plate according to the distance and mount it.
3. Install the unit and be sure to arrange the drain hose so that it is
leveled lower than the drain hose connecting port of the indoor unit.
8
300mm or
more
300mm or
Drain hose
Drain hose
(Unit : mm)
1000
793
Back side
45
50
more

Advertisement

Table of Contents
loading

Table of Contents