4.
Glue the housing assembly to the two pipes as shown below. Note that the ports are revers-
ible so it does not matter which one is used for the electrical line or the plumbing line. Verify
that the housing is fully installed to ensure flush installation to the surface level. Remove the
pipe guide.
Pipe Flush With Housing
5.
Backfill the pit beneath the housing with dirt and/or gravel to about halfway up the pipes. The
System Overview diagram on page 5 shows the approximate level of the dirt/gravel.
6.
Apply gunite and fill behind the housing up to the level shown in the System Overview diagram
on page 5 and below.
Housing Assembly
glued to pipes
USE ONLY HAYWARD GENUINE REPLACEMENT PARTS
Gunite up to this line
After Gunite applied