Flue Installation - Worcester GREENSTAR 24 Installation, Commissioning And Servicing Instructions

Wall hung rsf gas fired condensing combination boiler
Table of Contents

Advertisement

1.
Fig. 25 Removing outer case
▶ Ensure that the sealing washers on the mounting plate connections.
▶ Locate the appliance on the top wall hanging plate.
Fig. 26 Locating the appliance on the hooks
▶ Ensure that the gas and water connections to the isolating valves are
made using the fibre washers supplied in the Literature/Hardware
pack.
PRV CONNECTION
Use the supplied quick connector to connect the copper PRV pipe to the
outlet pipe.
6 720 811 922 (2014/07)
2.
1.
6 720 614 156-03.1O
Fig. 27 PRV Connection
CONNECTING THE CONDENSATE TRAP
▶ Remove red blanking cap on condensate drain.
▶ Remove the grey condensate hose from the combustion chamber
during unpacking.
▶ Fit the grey condensate hose onto the condensate trap and route the
hose through the rear and bottom of the appliance ensuring a
constant fall from the trap outlet to the pipework connection.
▶ Check the hose is securely fit onto the trap.
▶ Make connection to condensate drain pipework with adaptor
(supplied in the Literature Pack).
The grey condensate hose can be reduced in length as
required.
Fig. 28 Fitting the condensate hose
4.5

FLUE INSTALLATION

HORIZONTAL FLUE (60/100mm diameter)
For vertical flues and 80/125mm horizontal flues, please refer to
separate instructions supplied with the flue kit.
To ease assembly of flue components, apply silicone
lubricant to sealing surfaces.
Basic instructions for the 60/100mm diameter flue are shown below.