Page 4
TORUS 8 Rigging Manual Position the T8GRID on top of the first TORUS 8 cabinet, locate the links and insert the rigging pins. Make sure the cabinet is secured on both sides before lifting. Lift the array to a height where the next cabinet can be positioned underneath. Either lift the cabinet into position or lower the array onto the cabinet below.
Rotate the T8GRID through 180° and release links from the stow position Position the T8GRID on top of the first TORUS 8 cabinet, rotate the links and insert the rigging pins. Make sure the cabinet is secured on both sides before lifting.
Need help?
Do you have a question about the TORUS 8 and is the answer not in the manual?
Questions and answers