This Installation, Operation and Maintenance manual provides important information on safety and the proper inspection, installation, operation, maintenance, and primary testing of the BJM Pumps® PERFECTA Series Submersible Pumps. This manual also contains information to optimize performance and longevity of your BJM Pumps® PERFECTA Series Submersible Pumps.
SAFETY Pump installations are seldom identical. Each installation and application can vary due to many different factors. It is the owner/service mechanics responsibility to install, operate, repair, service, and test to ensure that the pump integrity is not compromised according to this manual. Risk of electric shock –...
4) Check for and tighten any hardware that appears loose. 5) Carefully read all tags, decals, and markings on the pump. If anything appears to be abnormal, contact your BJM Pumps distributor or Industrial Flow Solutions Operating, LLC. If damaged, the pump may need to be repaired before use.
PUMP INSTALLATION PERFECTA Series Submersible Pumps have been evaluated for use with various fluid applications. Please contact the manufacturer for additional information. Risk of Electric Shock. Single Phase Pump models for 115V, 60Hz are supplied with a cable having grounding conductor and grounding-type attachment plug.
Installation and checking of electrical circuits and hardware should be performed by a qualified licensed electrician. Follow the instructions provided with the Control Panel to wire the system. SUMP, PIPING AND POWERING- Refer PERFECTA Pump Installation Diagram B • The pump can be installed in a sump or into a small pit in the sump. The small pit should be well-leveled and having total volumetric size approximately double than that of the pump.
PUMP OPERATION This pump is designed to handle different type of liquids excluding volatile or flammable liquids. Do not attempt to pump any such liquid which may damage the pump or endanger personnel because of pump failure. Do not operate this pump where explosive vapors or flammable materials exist.
Table 1. PERFECTA Three Phase Pump Operation with Control Panel Single Phasing Float Switch Pump Operation Control Panel Breaker Preventor (SPP) Position 1 *Manual Mode To START Press ON/Green Push Button Down Will STOP Will remain energized To START Press ON/Green Push Button TO STOP Press OFF/RED Push Button AUTO Mode...
Pump must be disconnected from the electric power supply before proceeding to do any service or maintenance. To service or repair your pump, please contact your local BJM Pumps® distributor. Service should only be performed by a qualified electrician. Tools Needed...
Important notes on re-assembly of Pump ▪ All O-rings should be lubricated with a Silicone based grease, or lubricated with same oil as in motor, before assembly. ▪ Replace Ball Bearings to shaft. ▪ To re-install Motor Housing Cover, lubricate bearing holder. Use a plastic or rubber mallet to lightly tap until cover is in place.
Industrial Flow Solutions Operating, LLC 104 John W Murphy Drive New Haven, CT 06513, USA WARRANTY AND LIMITATION OF LIABILITY Industrial Flow Solutions Operating, LLC warrants each new pump against defects in workmanship and material for the period of 90 DAYS. It will replace or repair for the original purchaser, any genuine parts found to be defective upon return to its factory at CT (or other place as designated by it), transportation prepaid by purchaser.
Page 25
PERFECTA Pump-0.4HP, 2 Pole Parts List Pos. No. Part Name Pos. No. Part Name Cable Grommet ( for Float Cable) Pump Handle Screw 4.2X22 Cable Entry (for Float Cable) Pump Top Cover Float Switch O-ring 105X5 Cable Clamp (In side Top Cover) Screw 4X6 Screw 2.9X9.5 Relay, Pump Protection...
Need help?
Do you have a question about the PERFECTA Pump GF32 and is the answer not in the manual?
Questions and answers