Gauge And Hoses; Controls - Harvest TEC 675 Owner's Manual

100 gallon sprayer
Table of Contents

Advertisement

GAUGE AND HOSES

1. Mount gauge in a location visible from the operator's seat.
2. Run the hose from the pump to the gauge.
3. Run the hose from the gauge to the nozzle assembly.
4. Place check valve in line between the gauge and the nozzle (arrow pointing to tip).

CONTROLS

1. Locate a place for the control box on the beam between the front and right side windows.
2. Run the wire plug out of the cab to the socket under the main fuse box behind the cab.
3. Run the wire with two quick connects outside of the cab to the pump.
4. Plug the black wires together and the green wires together.
5. Note: The control box will not come on until the machine is running with it's head down, and
the feed rolls are engaged.
9

Advertisement

Table of Contents
loading

Table of Contents