Installation Instructions For New Holland Fx Series; Tank And Frame Installation; Nozzle Assembly - Harvest TEC 675 Owner's Manual

100 gallon sprayer
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS FOR NEW HOLLAND FX SERIES

TANK AND FRAME INSTALLATION

1. Remove outer handrail on right hand fender of machine. Note that the front part of handrail will
remain on machine.
2. Drill a hole in the angle iron bracing on backside of tank. Drill 9/16" hole in bottom leg of angle
iron 15-5/8" back from where the angle iron and tank frame meet.
3. Bolt the tank support, 6706A, to the hole just drilled with ½" x 1" bolt, nut, and lock washer
provided in kit.
4. Using help, lift tank assembly onto fender. It will be a tight fit.
5. Bolt tank support to holes with 1-½" x 3/8" bolts and lock washers provided.
6. Bolt front of saddle to machine using ½" x 1-½" bolts, nuts, washers and lock washers.
Note that the washer should be on the bottom side of fender for maximum support.

NOZZLE ASSEMBLY

1. Locate the band lubricator nozzle on the front side of the blower band according to the drawing
below.
2. Cut a hole in the blower housing to match the inside of the spray nozzle housing.
3. Weld to blower.
12:00
1:00
Center
Line
12:30
8

Advertisement

Table of Contents
loading

Table of Contents