INSTALLATION OF CHUTE LUBE BAR

1. The spray bar will be located in the transition chute before the blower box, similar to the
location shown in the diagram. Six holes will have to be drilled in the feed chute- four 9/16"
holes for the spray nozzles and two 3/8" holes for bolting the spray bar in place. Place the
spray bar on the chute and mark the location for the 9/16" and 3/8" holes. Use the enclosed
5/16" x 1" bolts to hold the spray bar in place. Make sure the bolts are inserted from inside the
chute to minimize build-up. Note: the washers (not included) may need to be used on the bolts
between the spray bar and chute so the tips of the spray nozzles are flush with inside of the
chute.
Test the unit:
1. Fill the tank with several gallons of water.
2. Turn the sprayer on and check for leaks.

CONNECTING THE SPOUT AND CHUTE NOZZLE PLUMBING

1. The enclosed tee assembly should be placed in the line after the pressure gauge.
2. To run the chute lubricator only, keep the enclosed cap on the tee.
3. To run the spout nozzle only, replace the quick connect that goes to the spout with the quick
connect that goes to the chute.
4. To run both chute and spout nozzles, place both quick connects going to the nozzles on the