Connecting The Shuttle-Train Control - tams elektronik PZS-3 Manual

Shuttle-train control
Hide thumbs Also See for PZS-3:
Table of Contents

Advertisement

English

Connecting the shuttle-train control

Dividing the shuttle-train section into parts
The halts at the terminus stations and the two stops are initiated when
the train has come into the respective section and the accessory track
busy indicator has indicated the train coming in. The division of the
shuttle-train section should be done as follows:
§
At least into the parts: terminus station 1 and terminus station 2.
§
If neccessary into the additional parts: stop 1 and / or stop 2.
§
In order to define a new part you should cut the middle conductor
at that point where the coming-in train has to start braking.
Connecting the shuttle-train section to the module
Follow the connections diagrams fig. 2 and the list below.
Make the connections between the shuttle-train section and the
connection points of the module according to the connecting diagram
and the list. You must make those connections marked grey in the list.
The other connections should be made only if required.
Connecting the power supply
Supplying transformer (= power supply
of the module)
!
Do not power the transformer yet!
Driving transformer (= power supply for the
shuttle-train section)
Page 44
2 and 10
3 and 11
PZS-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

21-01-09522-01-095

Table of Contents