DVB MPBR-HP Installation Manual

DVB MPBR-HP Installation Manual

Bridge hardware kit

Advertisement

BRIDGE HARDWARE KIT
MPBR-HP
TOOLS
REQUIRED
-3mm Allen Bit

WARNINGS/CAUTIONS BEFORE STARTING INSTALLATION

Before you install this kit —
instructions, warnings, cautions, and notes contained in
this installation instruction guide. Consult your vehicle
owner's manual for proper disconnection of electrical and
lifting of vehicle if required for installation of this product.
This install may require some technical skills and
knowledge of basic mechanical work. If you do not feel that
you are capable of performing this install please take this
product to a trained professional.
After reading this guide please contact us with any
questions or concerns before installing product.
Customer Service: 855-680-9595
DV8 Offroad is not responsible for any bodily injury or harm to you
or your vehicle as a result of an improper install.
6400 SYCAMORE CANYON BLVD.
RIVERSIDE, CALIFORNIA 92507
855-680-9595
WWW.DV8OFFROAD.COM
SKILL
LEVEL
- Novice
- 1 Person (You)
Little skill level required, you can
easily install it by yourself
Read and understand all
PRODUCT
INSTALLATION
TIME
- .5 Hour
Time to install this should only
take about half an hour
Proper installation of this kit required knowledge of the factory
recommended procedures for removal and installation of original
equipment components. We recommend that the factory shop manual
and any special tools needed to service your vehicle be on hand during
the installation. Installation of this kit without proper knowledge of the
factory recommended procedures may affect the performance of these
components and the safety of the vehicle
• Always wear eye protection when operating power tools
Inspect all contents of this package to make sure product is not damaged
and all installation hardware has been included. If parts are missing from
kit, please be prepared to provide the following information
1. Name of purchase location
2. Bar Code on side of box
3. Date above bar code
4. Date inside box cover
NEED HELP?
MANUAL
REQUIRED
855-680-9595

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MPBR-HP and is the answer not in the manual?

Questions and answers

Summary of Contents for DVB MPBR-HP

  • Page 1 6400 SYCAMORE CANYON BLVD. PRODUCT INSTALLATION MANUAL RIVERSIDE, CALIFORNIA 92507 855-680-9595 WWW.DV8OFFROAD.COM BRIDGE HARDWARE KIT MPBR-HP TOOLS REQUIRED SKILL LEVEL TIME REQUIRED -3mm Allen Bit - Novice - .5 Hour - 1 Person (You) Time to install this should only...
  • Page 2 INSTALLATION MANUAL Begin by unpacking all items and inspecting for missing pieces or damage. If you have any concens, please contact the company the product was purhcased from. HARDWARE INCLUDED -(8) M5x16 Allen Head -(8) M5x12 Allen Head -(2) M5 Pem Nuts STEP 1 | To install pem nuts, place the provided M5 hardware through the top...
  • Page 3 INSTALLATION MANUAL STEP 3 | We provide different length hardware for different size mounts. Use your best judgement when determining which hardware to use. (Shown) The Diamond Base Ram Mount accepts the M5x12(shorter) hardware easily. NEED HELP? 855-680-9595...

Table of Contents