Prepare Hot Water Line; Installation Instructions; Step 1 Check Door Balance - GE Monogram ZBD6890KII Manual

Fully integrated built-in dishwasher
Table of Contents

Advertisement

Available languages

Available languages

PREPARE HOT WATER LINE

• The line may enter from either side, rear or floor
within the shaded area shown in Figure F.
• The line may pass through the same hole as the
electrical cable and drain hose. Or, cut an additional
1-1/2" dia. hole to accommodate the water line.
If power cord with plug is used, water line must
not pass through power cord hole.
1-1/2" Dia.
Shut-off
Hole
Valve
Hot
2"
From
Cabinet
Cabinet Face
Water Line Connection
• Turn off the water supply.
• Install a hand shut-off valve in an accessible location,
such as under the sink. (Optional, but strongly
recommended and may be required by local codes.)
• Water connection is on the left side of the dishwasher.
Install the hot water inlet line, using no less than 3/8"
O.D. copper tubing. Route the line as shown in Figure F
and extend forward at least 19" from rear wall.
• Adjust water heater for 120°F to 150°F temperature.
• Flush water line to clean out debris.
• The hot water supply line pressure must be 20-120 PSI.
CAUTION
Do not remove wood base until you are ready
to install the dishwasher. The dishwasher will tip over
when the door is opened if the wood base is removed.

Installation Instructions

19" From Wall
2" From Floor
Figure F
BEFORE YOU BEGIN
Locate and set aside (for use in Step 12) the
2 Phillips special head screws wrapped with
yellow tape and stuck to the top or side of the
dishwasher. Remove drain hose from upper rack, if
it has not been pre-installed, and set aside for use in
Step 7.
STEP 1
CHECK DOOR BALANCE
• With dishwasher on the wood skid, check the door
balance by opening and closing the door.
• If the door drops when released, increase the spring
tension. If the door rises when released, decrease
the tension.
NOTE: The addition of the custom panel on model
ZBD6890 will require exchange of the factory installed
springs. Use the heavy-duty springs provided. See the
custom panel template for additional instructions.
• Position the spring for increased or decreased
tension as required.
NOTE: Adjust both balance springs to the same
amount of tension to prevent excessive door
twisting during use.
Figure G
Pulley
Shoulder
Correct Spring
Cable Routing
TIP: If door does not open easily or falls too quickly,
check the spring cable routing. Check that the cable
is properly aligned on the pulley (as shown).
7
Use This
Mounting
Hole
Decrease
Tension
Increase
Tension

Advertisement

Table of Contents
loading

Table of Contents