The following figure shows the communication connectors.
1. Cellular plug-in antenna connector (Optional plug-in connecting to the
monitoring system).
2. Plug-in antenna connector of SolarEdge home network (supplied with
pre-installed antenna).
3. CAN Bus connector for battery interface: Use a six-wire, shielded twisted
pair cable with RJ45 connector or CAT5e/6 twisted pair straight Ethernet
cable with RJ45 connector.
4. RS485-2 follower inverters connector: Use CAT 5e/6 3-wire, shielded,
twisted pair (0.2- 1 mm²).
5. RS485-1 Meter Connector (if a backup interface is not used): Use CAT6 3-
wire, shielded, twisted pair (0.2- 1 mm²).
6. Ethernet connector: Use CAT5e/6 cable with twisted pair wires and RJ45
connector.
7. Seven-pin socket of backup interface: Use 5-wire shielded twisted pair
cable, 600V insulated or CAT6. Three-pin Connector (if a backup interface
is not used): Use CAT6 3-wire, shielded, twisted pair (0.2- 1 mm²). Plug
the 3-pin connector to the left side of the seven-pin socket.
Chaining Inverters
Connect the RS485-2, BAG terminals of the communication board of the Leader
inverter to the BAG terminals of the communication board of the Followers.
The following figure shows how to connect a chain of inverters to the monitoring
system.
Connecting to a Meter
The following figure shows how to connect a meter to the inverter.
Commissioning and Setting and Operation
Hold On/Off/P switch in P position
for 5 seconds and release. Run the
SE SetApp application on your
mobile device and follow the on-
screen instructions.
To configure communication with the Monitoring Platform: From the
Commissioning menu, select Monitoring Communication > Auto Select.
SetApp will automatically detect your connection method. Follow the
on-screen instructions to complete the configuration and establish
communication with the monitoring platform.
Support Contact Information: If you have technical problems concerning SolarEdge products, please contact us:
Subject to change without notice. Copyright © SolarEdge Inc. All rights reserved. August 2022.
The following figure shows the
On/Off/P switch.
P On Off
P
1
LED indications: Green: power
production, Blinking Green: Grid
connection ok, Blue:
communication ok, Red: fault. For
more indications refer to:
https://www.solaredge.com/leds
For remote status, fault indications, and system performance, refer to Remote
Monitoring at:
https://www.solaredge.com/products/pv-monitoring#/
PV String Connection
NOTE: Use PV modules with IEC 61730 Class A rating.
The following figure shows the connection of the power optimizers in a PV string.
Battery Connection
CAUTION! Before making any connection to the inverter, make sure that the
battery DC Switch is OFF.
The following figures show how to connect a SolarEdge battery to the inverter.
IMPORTANT: When connecting the DC cables, keep the correct order of the
washer and spring washer, as shown in the figure below. Fasten the securing
screw of the cables cover to a torque of 2.2 N*m.
General Information
This product does not require maintenance