Trane S9V2B040U3PSBC/D Installation, Operation And Maintenance Manual page 93

Upflow/horizontal and dedicated downflow gas-fired, direct/non-direct vent, 2-stage condensing variable speed furnaces
Table of Contents

Advertisement

6. Remove two 3" plugs on left side of cabinet. To be
used for combustion air exhaust and inlet.
7. Reuse the two 3" plugs to seal the two 3" default
openings on the top of the cabinet.
8. Loosen the clamp holding the 45° elbow. Remove
the elbow and discard.
9. Remove the three inducer mounting screws.
10. Rotate inducer counterclockwise so that the inducer
outlet aligns with the exhaust vent outlet.
11. Reinsert and tighten screws to 30 in.-lbs. Do not
overtighten.
S9V2-SVX001-1A-EN
F F u u r r n n a a c c e e C C o o m m b b u u s s t t i i o o n n A A i i r r E E x x h h a a u u s s t t O O p p t t i i o o n n s s
12. Remove the pressure switch bracket assembly.
13. Remove the screw that holds PS2, rotate 90 degrees
counterclockwise, and reattach.
14. Reattach the pressure switch bracket assembly.
N N o o t t e e : : The illustration shows PS2 in its final position
after being rotated.
93

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents