Trane S9V2B040U3PSBC/D Installation, Operation And Maintenance Manual page 59

Upflow/horizontal and dedicated downflow gas-fired, direct/non-direct vent, 2-stage condensing variable speed furnaces
Table of Contents

Advertisement

Horizontal Right and Downflow Furnace — no Coil
Important: A BAYBASE is required when installing the furnace on a
I I n n s s t t a a l l l l a a t t i i o o n n I I n n s s t t r r u u c c t t i i o o n n s s
1. Bend furnace flanges up.
2. Set the coil on top of the furnace.
3. Screw through the coil cabinet into the furnace
flange. Guide holes are located on the coil.
4. Seal per local codes and requirements.
5. Support the furnace and coil independently.
6. Cut the back flange along perforation.
S9V2-SVX001-1A-EN
combustible floor.
Refer to
Step
1,
Step
11,
Step 4
7. Starting at the back of the furnace, cut the side
flanges along perforations until past the end of the
heat shield to avoid interference when bending.
8. Bend furnace side flanges down.
9. Match the coil up flush to the back of the furnace.
10. Set the furnace on top of the coil so that it is flush
with the back of the furnace.
11. Attach ducting.
F F u u r r n n a a c c e e G G e e n n e e r r a a l l I I n n s s t t a a l l l l a a t t i i o o n n
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents