Introduction; Codes And Standards; Electrostatic Discharge (Esd) Precautions - Bryant H Series Installation, Start-Up, And Operating Instructions Manual

Deluxe 4–way multipoise fixed-capacity direct-vent condensing gas furnace
Table of Contents

Advertisement

These furnaces are shipped with the drain and pressure tubes
connected for UPFLOW applications. Minor modifications are
required when used in DOWNFLOW, HORIZONTAL RIGHT, or
HORIZONTAL LEFT (supply-air discharge direction) applica-
tions as shown in Fig. 1. See details in Applications section.
This furnace must be installed with a direct-vent (combustion air
and flue gas) system and a factory accessory termination kit. In a
direct-vent system, all air for combustion is taken directly from the
outdoor atmosphere and flue gases are discharged to the outside
atmosphere. See furnace and factory accessory vent-air intake
termination kit instructions for proper installation.
These furnaces are shipped with the following materials to assist in
proper furnace installation. These materials are shipped in the main
blower compartment.
Installer Packet includes:
Installation, Startup, and Operating Instructions
Service and Maintenance Instructions
User's Information Manual
Warranty Certificate
Loose Parts Bag includes:
Pressure tube extension
Collector Box or condensate trap extension tube
Inducer housing drain tube
1/2-in CPVC street elbow
Drain tube coupling
Drain tube coupling grommet
Vent and combustion-air pipe support
Condensate trap hole filler plug
Vent and combustion-air intake hole filler plug
Combustion-air pipe perforated disk assembly
Vent Pipe Extension
* ONLY supplied with some furnaces.
For accessory installation details, refer to accessory installation
instructions.

INTRODUCTION

The model 350MAV 4-way multipoise, Gas-Fired, Category IV,
direct-vent condensing furnace is available in model sizes ranging
in input capacities of 40,000 to 138,000 Btuh.

CODES AND STANDARDS

Follow all national and local codes and standards in addition to
these instructions. The installation must comply with regulations
of the serving gas supplier, local building, heating, plumbing, and
other codes. In absence of local codes, the installation must
comply with the national codes listed below and all authorities
having jurisdiction.
In the United States and Canada, follow all codes and standards for
the following:
I. SAFETY
• US: National Fuel Gas Code (NFGC) NFPA 54-2002/ANSI
Z223.1-2002 and the Installation Standards, Warm Air Heating
and Air Conditioning Systems ANSI/NFPA 90B
• CANADA: National Standard of Canada, Natural Gas and
Propane Installation Code (NSCNGPIC) CAN/CGA -B149.1
-and .2-M00
II. GENERAL INSTALLATION
• US: NFGC and the NFPA 90B. For copies, contact the National
Fire Protection Association Inc., Batterymarch Park, Quincy,
MA 02269; or for only the NFGC contact the American Gas
Association, 400 N. Capitol, N.W., Washington DC 20001
• CANADA: NSCNGPIC. For a copy, contact Standard Sales,
CSA International, 178 Rexdale Boulevard, Etobicoke (Tor-
onto), Ontario, M9W 1R3, Canada.
III. COMBUSTION AND VENTILATION AIR
• US: Section 8.3 of the NFGC, Air for Combustion and
Ventilation
• CANADA: Part 7 of the NSCNGPIC, Venting Systems and Air
Supply for Appliances
IV. DUCT SYSTEMS
• US and CANADA: Air Conditioning Contractors Association
(ACCA) Manual D, Sheet Metal and Air Conditioning Con-
tractors National Association (SMACNA), or American Soci-
ety of Heating, Refrigeration, and Air Conditioning Engineers
(ASHRAE) 2001 Fundamentals Handbook Chapter 34.
V. ACOUSTICAL LINING AND FIBROUS GLASS DUCT
• US and CANADA: current edition of SMACNA, NFPA 90B as
tested by UL Standard 181 for Class I Rigid Air Ducts
VI. GAS PIPING AND GAS PIPE PRESSURE TESTING
• US: NFGC; chapters 5, 6, 7, and 12 and national plumbing
codes
• CANADA: NSCNGPIC Parts 3, 4, 5, A, B, E, and H.
VII. ELECTRICAL CONNECTIONS
Quantity
• US: National Electrical Code (NEC) ANSI/NFPA 70-2002
1
• CANADA: Canadian Electrical Code CSA C22.1
1
1

ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS

2
1
CAUTION: Electrostatic discharge can affect electronic
1
components. Take precautions during furnace installation
2
and servicing to protect the furnace electronic control.
3
Precautions will prevent electrostatic discharges from
2
personnel and hand tools which are held during the
1
procedure. These precautions will help to avoid exposing
1*
the control to electrostatic discharge by putting the
furnace, the control, and the person at the same electro-
static potential.
1. Disconnect all power to the furnace. Multiple disconnects
may be required. DO NOT TOUCH THE CONTROL OR
ANY WIRE CONNECTED TO THE CONTROL PRIOR
TO DISCHARGING YOUR BODY'S ELECTROSTATIC
CHARGE TO GROUND.
2. Firmly touch the clean, unpainted, metal surface of the
furnace chassis which is close to the control. Tools held in
hand during grounding will be satisfactorily discharged.
3. After touching the chassis, you may proceed to service the
control or connecting wires as long as you do nothing to
recharge your body with static electricity (for example; DO
NOT move or shuffle your feet, DO NOT touch un-
grounded objects, etc.).
4. If you touch ungrounded objects (and recharge your body
with static electricity), firmly touch a clean, unpainted metal
surface of the furnace again before touching control or
wires.
5. Use this procedure for installed and unistalled (ungrounded)
furnaces.
6. Before removing a new control from its container, dis-
charge your body's electrostatic charge to ground to protect
the control from damage. If the control is to be installed in
a furnace, follow items 1 through 4 before bringing the
control or yourself in contact with the furnace. Put all used
and new controls into containers before touching un-
grounded objects.
7. An ESD service kit (available from commercial sources)
may also be used to prevent ESD damage.
—3—
HAVING JURISDICTION.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

350mav

Table of Contents