Condensate Trap Tubing (Factory-Shipped Orientation); Condensate Trap Location (Alternate Upflow Orientation) - Bryant H Series Installation, Start-Up, And Operating Instructions Manual

Deluxe 4–way multipoise fixed-capacity direct-vent condensing gas furnace
Table of Contents

Advertisement

BLOWER SHELF
CONDENSATE
TRAP (INSIDE)
ALTERNATE DRAIN
TUBE LOCATION
CONDENSATE TRAP
DRAIN TUBE LOCATION
UPFLOW APPLICATIONS
B. Condensate Trap Tubing (Factory-Shipped
Orientation)
NOTE: See Fig. 6 or tube routing label on main furnace door to
confirm location of these tubes.
1. Collector Box Drain, Inducer Housing Drain, Relief Port,
and Pressure Switch Tubes.
These tubes should be factory attached to condensate trap
and pressure switch ready for use in UPFLOW applications.
These tubes can be identified by their connection location
and also by a color label on each tube. These tubes are
identified as follows: collector box drain tube (blue label),
inducer housing drain tube (violet label or molded), relief
port tube (green label), and pressure switch tube (pink
label).
2. Condensate Trap Drain Tube
The condensate trap drain connection must be extended for
field attachment by doing the following:
a. Determine location of field drain connection. (See Fig. 2
or 6.)
NOTE: If internal filter or side Filter/Media Cabinet is used, drain
tube should be located to opposite side of casing from return duct
attachment to assist in filter removal.
b. Remove and discard casing drain hole plug button from
desired side.
c. Install drain tube coupling grommet (factory-supplied in
loose parts bag) in selected casing hole.
FURNACE
CONDENSATE
DOOR
TRAP
1 4
FIELD
26
DRAIN
CONN
SIDE VIEW
DOWNFLOW AND ALTERNATE
EXTERNAL UPFLOW APPLICATIONS
SLOT FOR SCREW
HORIZONTAL
APPLICATION
(OPTIONAL)
1 2
1
3 4
1 8
7
3 4
1
7 8
WIRE TIE
GUIDES
(WHEN USED)
FRONT VIEW
SIDE VIEW
Fig. 5—Condensate Trap
FURNACE
SIDE
7 8
4
1 2
FIELD
1
DRAIN
CONN
FRONT VIEW
1
OD
4
COLLECTOR BOX TO
TRAP RELIEF PORT
1
OD
2
INDUCER HOUSING
DRAIN CONNECTION
5
OD
8
COLLECTOR BOX
DRAIN CONNECTION
SCREW HOLE FOR
UPFLOW OR DOWN-
FLOW APPLICATIONS
(OPTIONAL)
1 4
1
2
-IN. PVC OR CPVC
2
d. Slide drain tube coupling (factory-supplied in loose parts
bag) through grommet ensuring long end of coupling
faces blower.
e. Cement 2 factory-supplied 1/2-in. street CPVC elbows to
the rigid drain tube connection on the condensate trap.
(See Fig. 6.) These elbows must be cemented together
and cemented to condensate trap drain connection.
NOTE: Failure to use CPVC elbows may allow drain to kink and
prevent draining.
f. Connect larger diameter drain tube and clamp (factory-
supplied in loose parts bag) to condensate trap and clamp
securely.
g. Route tube to coupling and cut to appropriate length.
h. Attach tube to coupling and clamp securely.
C. Condensate Trap Location (Alternate Upflow
Orientation)
An alternate location for the condensate trap is the left-hand side
of casing. (See Fig. 2 and 7.)
NOTE: If the alternate left-hand side of casing location is used,
the factory-connected drain and relief port tubes must be discon-
nected and modified for attachment. See Condensate Trap Tubing
(Alternate Upflow Orientation) section for tubing attachment.
To relocate condensate trap to the left-hand side, perform the
following:
1. Remove 3 tubes connected to condensate trap.
—6—
FURNACE
DOOR
FURNACE
SIDE
4
3 4
5
4
1 4
26
3 4
END VIEW
FRONT VIEW
HORIZONTAL
APPLICATIONS
3 4
5
A93026

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

350mav

Table of Contents