Note: Once all the screws are removed, the top cover plate and the module will be free from the
3. Disconnect the wires from one end of the Heat Module by unplugging the connectors. Move
4. Using 4 #6-32 x 3/8 inch mounting screws from the kit, align the mounting holes in the BCI-I
5. Replace the Heat Module onto its mounting plate and install the four screws removed in
6. Using 2 #6-32 x 3/8 inch screws and 2 #6 TYPE A washers from the kit, install the DIN rail for
7. Using 2 DIN rail end stops from the kit, install the module onto the DIN rail. Refer to
Note: For IntelliPak factory-installed mounting, refer to
IntelliPak II - Module Installation
1. Disconnect all power from the Rooftop or Air Handler Unit.
2. Using 2 #10-32 x 1/2 inch screws from the kit, install the DIN rail for the BCI-I Module as shown
3. Using 2 DIN rail end stops from the kit, install the module onto the DIN rail. Refer to
Figure 1. BCI-I Controller board
6
mounting plate. Remove and discard the Heat Module Cover Plate.
the module away from its mounting plate.
Mounting bracket with the holes in the Heat Module mounting plate. Refer to
Figure 6, p.
11) for proper orientation.
2. Reconnect all wiring plugs to their appropriate terminals.
the BCI-I Module as shown in
p. 12
for DIN rail mounting/removal.
in
Figure
7.
for DIN rail mounting/removal.
(Figure 2, p. 7
-
Figure 6, p.
Figure 7, p.
(Figure 2, p. 7
11).
11.
RT-SVN13A-EN
-
Step
Figure 8,
Figure 8

Advertisement

Table of Contents
loading

Table of Contents