Operation Customer Assistance; Quick Evaluation Before Installation - Cobra CPI 1575 Operating Instructions Manual

1500 watt power inverter
Table of Contents

Advertisement

10275_CPI1575_PH3
8/14/07
8:38 AM
Main Icons
Quick Evaluation
Before Installation
Introduction
Intro
Operation
Customer

Quick Evaluation Before Installation

Assistance
This section provides you with basic information about the
inverter and how to check its performance before installation.
Be sure to have on hand:
Installation
A 12 volt DC power source (such as a vehicle battery).
Secondary Icons
The power source must provide
Power Source
between 11 and 15 volts DC and
be able to supply enough current to
run the test load. As a rough guide,
divide the wattage of the test load by
Notice
Caution
10 to get the current (in amperes)
the power source must deliver.
Cables to connect the power source to the inverter
(not included).
The cables must be as short and thick as possible in
order to reduce the voltage drop between the power
source and the inverter when it is drawing current
from the power source.
If the cable suffers an excessive voltage drop, the inverter
may shut down when drawing higher currents because
the voltage at the inverter dropped below 10 volts.
#4 AWG stranded copper cable is recommended.
It should be no longer than four feet (one and one-half
meters).
The end of the cable that connects to the inverter
must have its insulation stripped off for about
one-half inch (one and one-half cm) back from
the end, exposing the bare copper.
The other end of the cable, which connects to the power
source, must be terminated with a lug or other connector
that provides a secure, low resistance connection.
For example, if the power source is a battery, the cable
must be terminated with a battery terminal that clamps
to the post on the battery.
4
Page 4
Main Icons
Introduction
Warranty
Intro
Main Icons
A test load that can be plugged into the AC receptacle on
the inverter for short term testing at a low power level.
The following cables are recommended for testing low
power level test loads only.
Test Load
Notes
Intro
Secondary Icons
To check your inverter's performance before installation:
Warning
Secondary Icons
Power Button
Main Icons
Connect Terminals
Main Icons
Intro
Connect Power Source
Main Icons
Intro
Operation
Main Icons
Secondary Icons
Power Button
Installation
Secondary Icons
Intro
Connect Test Load
Secondary Icons
USB Outlet
Secondary Icons
Quick Evaluation
Before Installation
Operation
Customer
Warranty
Assistance
Test Load
Minimum
Installation
Notes
Power
Cable Size
Operation
Customer
Warranty
Assistance
100W
# 16 AWG copper
250W
# 12 AWG copper
500W
# 8 AWG copper
Installation
Notes
Notice
Caution
Warning
1. Turn the inverter off (see page 14
for details). If the power source is
a DC power supply, switch it off
as well.
Notice
Caution
Warning
2. Connect cables to power input
terminals (see page 8 for details).
3. Connect cables to power source
(see page 8 for details).
Operation
Customer
Warranty
4. Check to make sure all
Assistance
connections are secure.
5. Turn the inverter on. If the power
source is a DC power supply,
Installation
Notes
switch it on first.
Customer
Warranty
Assistance
6. Plug in the test load.
Intro
Operation
Customer
Warranty
The inverter should supply power
Assistance
to the load. If the inverter is not
working properly, refer to the
Notes
Notice
Caution
Warning
troubleshooting guide on page 20
Operation
Customer
Warranty
or power and protection indicators
Installation
Notes
Assistance
section on page 16.
NOTE A USB device can be
Notice
Caution
Warning
Installation
Notes
used to check the output
Notice
Caution
Warning
of the USB Outlet.
Nothing Comes Close to a Cobra
5
Notice
Caution
Warning

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents