Operation Customer Assistance; Quick Evaluation Before Installation - Cobra CPI 1000 Operating Instructions Manual

1000 watt power inverter
Hide thumbs Also See for CPI 1000:
Table of Contents

Advertisement

10274_CPI1000_vC
8/14/07
3:48 PM
Main Icons
Quick Evaluation
Before Installation
Introduction
Intro
Operation
Customer

Quick Evaluation Before Installation

Assistance
This section provides you with basic information about the
inverter and how to check its performance before installation.
Be sure to have on hand:
Installation
A 12 volt DC power source (such as a vehicle battery).
Secondary Icons
The power source must provide
Power Source
between 11 and 15 volts DC and
be able to supply enough current to
run the test load. As a rough guide,
divide the wattage of the test load by
Notice
Caution
10 to get the current (in amperes)
the power source must deliver.
Cables to connect the power source to the inverter.
Cables are supplied with the unit that are two feet
long overall from the tip of the clamp shown to the
stripped and tinned end for insertion in the Input
End of the unit.
If user supplied cables are to be used, they must be
as short and thick as possible in order to reduce the
voltage drop between the power source and the inverter
when it is drawing current from the power source.
If the cable suffers an excessive voltage drop, the inverter
may shut down when drawing higher currents because
the voltage at the inverter dropped below 10 volts.
A test load that can be plugged into the AC receptacle on
the inverter for short term testing at a low power level.
The following cables are recommended for testing low
power level test loads only.
Test Load
Test Load
Power
100W
# 16 AWG copper
250W
# 12 AWG copper
500W
# 8 AWG copper
4
Page 4
Main Icons
Intro
Introduction
Warranty
Intro
To check your inverter's performance before installation:
Secondary Icons
Power Button
Notes
Main Icons
Secondary Icons
Connect Terminals
Main Icons
Intro
Warning
Connect Power Source
Intro
Main Icons
Operation
Secondary Icons
Power Button
Main Icons
Installation
Secondary Icons
Connect Test Load
Intro
Secondary Icons
USB Outlet
Secondary Icons
Minimum
Cable Size
Operation
Customer
Warranty
Assistance
Quick Evaluation
Before Installation
Operation
Customer
Warranty
Installation
Notes
Assistance
1. Turn the inverter off (see page 14
for details). If the power source is
a DC power supply, switch it off
as well.
Installation
Notes
2. Connect cables to power input
Notice
Caution
Warning
terminals (see page 8 for details).
3. Connect cables to power source
(see page 8 for details).
4. Check to make sure all
Operation
Customer
Warranty
Notice
Caution
Warning
connections are secure.
Assistance
5. Turn the inverter on. If the power
source is a DC power supply,
switch it on first.
Installation
Notes
6. Plug in the test load.
Customer
Warranty
Assistance
The inverter should supply power
to the load. If the inverter is not
working properly, refer to the
troubleshooting guide on page 20
Notes
Notice
Caution
Warning
Intro
or power and protection indicators
Operation
Customer
Warranty
Assistance
section on page 16.
Operation
Customer
Warranty
Assistance
Installation
Notes
Notice
Caution
Warning
Installation
Notes
NOTE A USB device can be
used to check the output
of the USB Outlet.
Notice
Caution
Warning
Notice
Caution
Warning
Nothing Comes Close to a Cobra
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpi 2575Cpi 1575

Table of Contents