ABB SPS-48V Quick Start Manual page 3

Slimline power shelf
Hide thumbs Also See for SPS-48V:

Advertisement

QUICK START GUIDE
J3 1-Wire Battery Temp
Monitor
J5 LAN Port
Connectors are on rear.
1.
J1-2 Alarms and Inputs - Connect to office alarms and signals. See Information: Alarm Connections for Details
2.
J5 LAN - Connect to Ethernet network.
Step 8 - Install 1-Wire Battery Temp and Voltage Monitor per Galaxy Pulsar
Edge Controller Quick Start Guide -
1.
Connect 1-Wire Battery Temp and Voltage Monitor to J3
Firmly push the rectifier into the rectifier slot.
Tighten the thumb screw until the rectifier is
seated.
NOTE: When installing a rectifier in a
powered system the RUN LED on the rectifier
will blink until communication with the
controller is established.
Verify that all AC, DC and Alarm connections are complete and secure. Turn on AC input breakers. If there are no
alarms, make required adjustments to the default settings on the controller for this installation.
Verify and edit controller basic configuration parameters per site engineering instructions.
Page 3
© 2021 ABB. All rights reserved.
J2 Alarm inputs
Signal Connections
Optional
J1 Alarm outputs
USB Craft Port