Bosch LR 7CBS2 Series User Manual And Assembly Instructions page 18

Ceiling-mounted ventilation system
Table of Contents

Advertisement

en Installation instructions
Drill the hole depth in accordance with the length of
2.
the screws.
Install the appliance with a fixing material which is
3.
sufficiently stable and has been adjusted accord-
ingly for both the structural conditions and the
weight of the appliance.
Check the cut-out area for existing cables of other
4.
appliances.
Preparing the ceiling
Ensure that the stability of the ceiling is guaranteed
1.
after the cut-outs have been made.
Cover the hob to prevent damage.
2.
Saw a cut-out into the ceiling.
3.
x
x
y
±1
±1
487
888
487
±1
1188
±1
Remove any shavings.
4.
Preparing the appliance
WARNING ‒ Risk of injury!
Components inside the appliance may have sharp
edges.
Wear protective gloves.
Tilt the transport lock slightly upwards and carefully
1.
pull it upwards and out at an angle.
Remove polystyrene residues from the interior of the
2.
appliance.
Remove the grease filters.
3.
To avoid causing damage, do not bend the grease
filters.
18
All manuals and user guides at all-guides.com
z
y
z
16 – 50
16 – 50
Installing the appliance
WARNING ‒ Risk of injury!
¡ Components inside the appliance may have sharp
edges.
Wear protective gloves.
¡ The appliance is heavy.
To move the appliance, two people are required.
Use only suitable tools and equipment.
Insert the appliance into the cut-out until you hear
1.
the mounting brackets engage.
Carefully screw in diagonally opposite screws.
2.
5
Tighten the screws one at a time so that the appli-
ance is not wedged in the cut-out.
Note: To ensure that the appliance is not damaged,
3.
do not overtighten the screws.
Carefully tighten screws in succession until the ap-
pliance is flush-mounted on the ceiling.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lr 9cqs2 seriesLr 9cqs25b seriesLr97cbs25b

Table of Contents