BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed in the parts list provided.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Flathead screwdriver, Stanley knife, Wood saw, Step ladder, Hammer, Spirit level and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
- Ensure you have enough time to build the product to ensure the building is water tight.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to natural processes. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of hot weather
and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to prevent discolouration
whilst in stock. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the
building is treated with a suitable preservative in accordance with the manufacturers recommendations.
Care must be taken to ensure the product is placed on a suitable base.
We recommended using a suitable protection for your playhouse. As the product is destined for use by
children, a water based treatment for childrens toys is ESSENTIAL.
We also recommend treating the building prior to construction.
POSITIONING YOUR PLAYHOUSE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual treatment.
We recommend a minimum space of 2m around a playhouse, away from any structure or obstructions such as
fences, garages, houses, overhanging branches, washing lines or electrical wires.
It is recommended that the position of the Playhouse is not in direct sunlight.
Activity toys such as swings and slides for towers shall not be installed over concrete, asphalt or any hard
surface.
BUILDING A BASE
Ensure the base is level and is built on rm ground, to prevent distortion, checking with a spirit level. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external measurement of the
building, i.e. The cladding should overlap the base, creating a run o for water. It is also recommended that the
oor be at least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
- Wooden base.
WARNING: Only for domestic use
Not suitable for children under 36 months due to
small gaps and danger of falling from heights.
To be used under direct supervision of an adult
Please retain product label and instructions for future reference
WARNING
ONLY SUITABLE FOR DOMESTIC USE.
!
TO BE USED UNDER DIRECT SUPERVISION OF AN ADULT.
THIS PRODUCT SHOULD NOT BE MODIFIED IN ANY WAY. ANY MODIFICATIONS SHOULD BE
DETERMINED BY THE MANUFACTURER AND CARRIED OUT ACCORDING TO THE INSTRUCTIONS.
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY COMPONENT PARTS PRIOR TO ASSEMBLY.
MAX AGE OF 14 YEARS.
THIS TOY IS FOR OUTDOOR USE ONLY.
USE A WATER BASED TREATMENT THAT IS EN71 TESTED
CAUTION
Wood is a natural product and can change post manufacture. So despite every e ort being
made to ensure the material used are cut and machined to a clean and smooth nish, care
must be taken when handling the product and preparing for use by your child.
Any areas of concern, in the play areas, can be rubbed over with sandpaper to achieve a
smoother nish. Alternatively, call the customer service department who will be happy to
arrange replacement panels/parts.
All buildings should be erected by
x2
atleast two adults.
DO NOT ALLOW
CHILDREN TO ASSIST.
To prevent damage during
assembly, you MUST pilot
drill all screw holes and
ensure all screw heads are
2mm Drill bit
countersunk.
12mm CSK
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products
independently tested to EN71, we cannot accept responsibility for your safety whilst erecting this product.
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the
correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels
and garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium
dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
In all instances for assistance with your product, please contact customer care on :
01636 821215 or customerservice@merciagp.co.uk
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
For ease of assembly, you will
need a tape measure to check
dimensions of components.
www.merciagardenproducts.co.uk
P1

Advertisement

loading
Need help?

Need help?

Do you have a question about the SI-002-001-00109 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products SI-002-001-00109

  • Page 1 In all instances for assistance with your product, please contact customer care on : 01636 821215 or customerservice@merciagp.co.uk TYPES OF BASE - Concrete 75mm laid on top of 75mm hard-core. Mercia Garden Products Limited, - Slabs laid on 50mm of sharp sand. Sutton On Trent, - Wooden base.
  • Page 2: Product Codes

    Take a look at the di erent playhouse options below which refers to the product code combinations used to create each playhouse. Model Product Codes 7x5 Playhouse 02DTSHAX0705LFD5WBF-V1-PEFC (Playhouse) SI-002-001-00109 7x6 Playhouse With Veranda 02DTSHAX0705LFD5WBF-V1-PEFC (Playhouse) SI-002-001-0110 02DTAXVP0701-V1-PEFC (Veranda) 7x5 Playhouse 7x6 Playhouse With Veranda www.merciagardenproducts.co.uk...
  • Page 3 02DTSHAX0705LFD5WBF-V1-PEFC Please retain product label and instructions for future reference Look for the symbols and follow the safety guidlines below. Ensure screw heads are sub ush and Ensure the screws are 12mm gap sand down any xed squarely and do surrounding the splinters created.
  • Page 4 Please retain product label and instructions for future reference 7x6 Swiss Playhouse With Veranda (02DTSHAX0705LFD5WBF-V1-PEFC & 02DTAXVP0701-V1-PEFC) Support Block - 27x70x491mm QTY 2 Overall Dimensions: F2770-G-531mm (angled) Width = 2327mm Depth = 1838mm Height = 2435mm Window Frame QTY 5 Roof Support Bar - 27x70x1410mm QTY 1 PI-04-0013 Base Dimensions:...
  • Page 5 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Pre Assembly Step 1 Parts needed - & & & & & Pre drill Before assembling remove the transportation hole blocks from the bottom of each panel. Fix the Window Blocks (No.
  • Page 6 Please retain product label and instructions for future reference Step 2 Step 3 Parts needed - & & & Parts needed - Pre drill Pre drill hole hole Lay the Door Panel (No. 2) with the Place the Floor (No.1) on a rm and level boards facing up on a at surface.
  • Page 7 Please retain product label and instructions for future reference Step 5 Step 6 Parts needed - & Parts needed - & Pre drill hole Position the Door Panel (No. 2) and second Locate the Plain Gable Top (No. 5) on top of Window Panel (No.
  • Page 8 Please retain product label and instructions for future reference Step 7 Step 8 Parts needed - Parts needed - Pre drill Pre drill hole hole Locate the Bunk Floor Support Bars Locate the Bunk Floor Block D (No. 17) (No. 13) onto the Door Panel (No. between the framing of the door panel 2) and Back Panel (No.
  • Page 9 Please retain product label and instructions for future reference Step 10 Step 11 Parts needed - & Parts needed - & Pre drill Pre drill hole hole Locate one Bunk Floor Block E (No. Locate two Bunk Floor Block E’s (No. 18) ush to the panel framing.
  • Page 10 Please retain product label and instructions for future reference Step 14 Step 12 Parts needed - & & Parts needed - Pre drill Pre drill hole hole Away from the building, locate two Bunk Locate the Bunk Floor Block B (No. 15) oor block A’s (No.
  • Page 11 Please retain product label and instructions for future reference Step 17 Step 16 Parts needed - Parts needed - Pre drill Pre drill hole Locate the Safety Rail (No. 10) on top hole Locate the Bunk Floor (No. 7) on top of the bunk oor, ensure the safety of the support bars (No.
  • Page 12 Please retain product label and instructions for future reference Step 18 Step 19 Parts needed - 2 & & Parts needed - Pre drill Pre drill hole hole Line the Support Blocks (No. Place one Roof Panel (No. 8) onto the 22) up with the gable framing at the building, ensuring the roof rests into the front and back of the building, as...
  • Page 13 Please retain product label and instructions for future reference Step 20 Step 22 Parts needed - Parts needed - & Pre drill hole Pre drill hole Locate and secure the other side of the Fix the Gable Cover Trims (No. 19) roof (No.
  • Page 14 Please retain product label and instructions for future reference Step 23 Parts needed - Pre drill hole Cut felt (No. 37) into 4 sheets measuring: 1890mm (L) X 1000mm (W) and lay onto roof. Start at the bottom of the roof and work your way up so that rain pours over the top of the laps and not under them.
  • Page 15 Please retain product label and instructions for future reference Step 24 Step 25 Parts needed - & Parts needed - & Pre drill Pre drill hole hole Fix the Fascias (No. 27) to the front Locate a Window Box (No. 28) below and back of the building using each window.
  • Page 16: After Treatment

    Please retain product label and instructions for future reference Step 26 Parts needed - & & Pre drill It is ESSENTIAL that you apply wood hole Place a Window Frame Cross treatment immediately after the building (No. 31) against the inside of each has been assembled.
  • Page 17 Please retain product label and instructions for future reference Step 25a 7x1 Veranda add on Pack B steps: Parts needed - Pre drill hole Position the Support Rail A’s (No. Step 23a 42) on top of either side of the Parts needed - Pre drill Veranda Floor (No.
  • Page 18 Please retain product label and instructions for future reference Step 27a Step 26a Parts needed - Parts needed - Pre drill Pre drill hole hole Position the Support Rail B (No. 43) on Position the Front Rail (No. 40) on top of the Veranda Floor (No.
  • Page 19 Please retain product label and instructions for future reference Step 28a Step 29a Parts needed - Parts needed - & Pre drill Pre drill hole hole Cut felt (No. 37) into 4 sheets measuring: Fix the Fascias (No. 27) to the front 1890mm (L) X 1000mm (W) and back of the building using and lay onto roof.
  • Page 20 Please retain product label and instructions for future reference Step 30a Step 31a Parts needed - & Parts needed - & & Pre drill hole Pre drill Locate a Window Box (No. 28) onto Place a Window Frame Cross hole the Front Rail (No.
  • Page 21 Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back Playhouse Maintenance: It is recommended that the following checks and maintenance are carried out at the beginning of each season as well as at regular intervals during the usage season.
  • Page 23 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...