Download Print this page

Mercia Garden Products 02PLM0404-V1 General Instructions Manual

Advertisement

Quick Links

General Instructions
02PLM0404-V1
PLUM PLAYHOUSE
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
Please note: If purchased with a tower please read both sets of instructions before beginning assembly.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.

Advertisement

loading
Need help?

Need help?

Do you have a question about the 02PLM0404-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 02PLM0404-V1

  • Page 1 For assistance please contact customer care on: 01636 880514 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in...
  • Page 2 02PLM0404-V1 Please retain product label and instructions for future reference Fixing Kit Overall Dimensions: Length = 1166mm Width = 1277mm Height = 1137mm Ridge Bar - 28x28x1118mm Qty 1 Base Dimensions: Length = 1110mm Width = 1170mm Eaves Frame - 28x28x1142mm Qty 2...
  • Page 3 Please retain product label and instructions for future reference Step 2 Step 4 Lay the door gable face up on a at Attach the Plain Gable to a Window Side surface, place the door within the door together with 3x50mm screws. aperture.
  • Page 4 Please retain product label and instructions for future reference Step 8 Step 6 Fix the panels to the oor using 50mm Place the Ridge Bar in between the screws as shown in the illustration. front and back panels. Ensure the framing sits ontop of the central upright on both gables (see illustration).
  • Page 5 Please retain product label and instructions for future reference Step 9 Step 11 Cut the felt into 2 sheets and lay onto the Place the styrene in each roof as shown in the diagram ensuring window aperture ensure you there is a 50mm overhang around the remove the lm from both sides.
  • Page 6: After Treatment

    Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 12 Place the wooden door handle on the outside of door and use a It is ESSENTIAL that you apply wood treat- 60mm screw from the inside to secure.