Navien NCB700-2S Plus 42K Installation & Operation Manual page 39

Condensing combi boiler
Table of Contents

Advertisement

1
7
#
Description
1
Boiler
2
Visible air break
3
75 mm trap
4
Soil and vent stack
5
Invert
6
450 mm minimum up to three storeys
Minimum internal diameter 19 mm
7
(fall at least 45 mm per meter)
1
7
2
#
Description
1
Boiler
2
Visible air break
3
Visible air break at plug-hole
4
75 mm sink, basin, bath or shower waste trap
5
Sink, basin, bath or shower with integral overflow
Open end of condensate drainage pipe direct into gully 25mm
6
min below grating but above water level; end cut at 45°
Minimum internal diameter 19 mm
7
(fall at least 45 mm per meter)
8
Pipe size transition
9
Minimum internal diameter 30 mm
10 Water/weather proof insulation
2
4
6
3
5
3
5
9
10
4
8
6
4
6
#
Description
1
Boiler
2
Visible air break
3
75 mm trap
4
Sink, basin, bath or shower
Open end of condensate drainage pipe direct into gully 25
5
mm min below grating but above water level; end cut at 45°
6
Sink lip
Minimum internal diameter 19 mm
7
(fall at least 45 mm per meter)
8
Pipe size transition
9
Minimum internal diameter 30 mm
10 Water/weather proof insulation
1
2
ø22 mm
#
Description
1
Condensate discharge from boiler
2
Visible air break
3
Condensate pump
4
Visible air break at plug hole
5
Sink or basin with integrated overflow
6
75 mm sink waste trap
1
7
2
10
3
8
9
5
4
5
6
3
Installing the System Piping
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncb700-3s 54k

Table of Contents