Navien NCB300-28K Installation & Operation Manual

Navien NCB300-28K Installation & Operation Manual

Condensing combi boiler
Hide thumbs Also See for NCB300-28K:
Table of Contents

Advertisement

Condensing Combi Boiler
Installation & Operation
Manual
Getting Service
If your boiler requires service, you have several options for getting service:
Contact an official Technical Assistance Service (TAS) at 0844 332 2323 or go to the website
(www.navien.co.uk).
For warranty service, always contact an official Technical Assistance Service (TAS) first.
Contact the technician or professional who installed your boiler.
Contact a Gas Safe Registered engineer.
When contacting an official Technical Assistance Service (TAS), please have the following information
available:
Model number
Serial number
Date purchased
Installation location and type
Error code, if any appears on the front panel display
Navien LTD
Building 2, Guildford Business Park, Guildford, GU2 8XH
TEL 0844 332 2323 www.navien.co.uk
Version: 1.0(August, 2022)

Advertisement

Table of Contents
loading

Summary of Contents for Navien NCB300-28K

  • Page 1 Serial number ● Date purchased ● Installation location and type ● Error code, if any appears on the front panel display ● Version: 1.0(August, 2022) Navien LTD Building 2, Guildford Business Park, Guildford, GU2 8XH TEL 0844 332 2323 www.navien.co.uk...
  • Page 2 Manual These appliances are for use with natural gas or LPG. ● (An LPG conversion kit is included with the boiler.) Type: B23-C13-C33-C53-C83 ● Model NCB300-28K Natural Gas NCB300-37K NCB300-41K NCB300-28K NCB300-37K NCB300-41K Keep this manual near this boiler for future reference whenever maintenance or service is required.
  • Page 3: Table Of Contents

    8.4 Connecting the Room Stat or OpenTherm 2.2 Accessories 8.5 Connecting the Outdoor Temperature Sensor 2.3 Technical Data 8.6 OpenTherm® Protocol 2.4 Components 8.7 Connecting the Navien Smart Room Controller 2.5 Dimensions (Optional) 2.6 Operating Modes 8.8 Connecting the Navien Room Controller (Optional) 2.7 Installation Procedure 9.
  • Page 4: Safety Information

    1. Safety Information The following safety symbols are used in this manual. Read and DANGER follow all safety instructions in this manual precisely to avoid unsafe operating conditions, fire, explosion, property damage or personal injury. DANGER Indicates an imminently hazardous situation which, if not avoided, could result in severe injury or death.
  • Page 5 WARNING WARNING This appliance can be used by children aged from 8 years and above and persons with reduced physical, sensory or mental capabilities or lack of experience and knowledge if they have been given supervision or instruction concerning use of the appliance in a safe way and understand the hazards involved.
  • Page 6 CAUTION DANGER Do not turn on the boiler unless ● the water and gas supplies are fully opened. Doing so may damage the boiler. Do not turn on the water if the cold ● BURN water supply shut-off valve is closed. Doing so may damage the boiler.
  • Page 7 The Codes of good practice and regulations refer to the latest versions of the same. Navien ensures that this product contains no harmful The installation must also comply with the following European substances and that no harmful materials have been used in its Standards: manufacture.
  • Page 8 The Benchmark Scheme Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturer’s instructions by competent persons and that it meets the requirements of the appropriate Building Regulations.
  • Page 9: About The Boiler

    2. About the Boiler 2.1 Items Included When you open the box, you will find the following items with the boiler. Check the box for each of the following items before installing the boiler. If it seems like there is a problem, do not use the boiler. Contact your supplier. Keep the included items out of the reach of children, as they can be dangerous.
  • Page 10: Technical Data

    2.3 Technical Data The following table lists the general specifications for the boiler. NCB300-28K NCB300-37K NCB300-41K Specifications Unit Heat input range 24.7/4.3 26.8/4.6 26.8/4.6 DHW heat input range 28.0/4.3 37.0/4.6 41.0/4.6 Heat output range @ 80/60°C 24.0/4.2 26.0/4.5 26.0/4.5 DHW output range 28.0/4.3...
  • Page 11 NCB300-28K NCB300-37K NCB300-41K Specifications Unit Coaxial Ø60/100 and Ø80/ Flue exhaust/Air intake system diameters 125–Dual duct Ø80/80 Max. gas pipe pressure drop Max. horizontal coaxial length Ø60/100 Max. vertical coaxial length Ø60/100 Equivalent elbow length @ 90° Ø60/100 Equivalent elbow length @ 45° Ø60/100 Max.
  • Page 12 Annual fuel consumption Contact details Navien LTD, Building 2, Guildford Business Park, Guildford, GU2 8XH (*) High-temperature regime means 60 °C return temperature at heater inlet and 80 °C feed temperature at heater outlet. (**) Low temperature means for condensing boilers 30 °C, for low-temperature boilers 37 °C and for other heaters 50 °C return temperature (at heater inlet).
  • Page 13: Components

    2.4 Components The following diagram shows the key components of the boiler. Component assembly diagrams and particular parts lists are included in the Appendices. Fan & Motor Ignitor & Flame Rod Front Panel Gas Valve Circulation Pump NCB300-28K About the Boiler...
  • Page 14 Fan & Motor Ignitor & Flame Rod Front Panel Gas Valve Circulation Pump NCB300-37K NCB300-41K About the Boiler...
  • Page 15 Mixing Chamber Single Venturi Primary Heat Exchanger Secondary Heat Exchanger Gas Valve 3-Way Valve Return Adapter Filter Assembly Pressure Relief Valve Central Heating Supply Central Heating Return DHW Outlet DHW Inlet NCB300-28K About the Boiler...
  • Page 16 Mixing Chamber Single Venturi Primary Heat Exchanger Secondary Heat Exchanger Gas Valve 3-Way Valve Return Adapter Filter Assembly Pressure Relief Valve Central Heating Supply Central Heating Return DHW Outlet DHW Inlet NCB300-37K NCB300-41K About the Boiler...
  • Page 17: Dimensions

    Cold water inlet (DHW) 15 mm Central heating return 22 mm Overhead View Bottom View 197.5 mm 170.6 mm 170.6 mm 56 mm 56 mm 65 mm 65 mm 126 mm 126 mm 65 mm 65 mm NCB300-28K NCB300-37K NCB300-41K About the Boiler...
  • Page 18: Operating Modes

    2.6 Operating Modes Exhaust Air In Air In 2.6.1 Operating in Central Heating Mode To operate the central heating mode: Ignitor Blow Fan 1. Press the Menu button ( ) to access the CH temperature setting mode. Heat Exchanger Circulation Pump Three -way...
  • Page 19 The following table lists the central heating temperature When there is no further DHW demand, the burner ● range by k-factor setting value and the applicable outdoor switches off and the 3-way valve remains in DHW mode temperature range. position during a wait time (5 minutes by default), so that it can work more efficiently and provide more flexibility if the taps are continuously turned on and off.
  • Page 20: Installation Procedure

    2.7 Installation Procedure The flow diagram below provides a step-by-step description of the recommended procedure for clear, easy installation of the NCB300 boiler in its final location. A detailed description is given of the procedure in the sequenced sections below: Wall-mounting »...
  • Page 21: Installing The Boiler

    Installing the boiler in a location Carefully consider the following factors when choosing an without a drain will void the warranty and Navien will not be installation location: responsible for water damage that occur as a result. For more information about condensate drainage, refer to “4.3 Connecting...
  • Page 22 Adequate installation clearances Clean, debris and chemical-free combustion air Do not install the boiler in areas where dust and debris may ● accumulate or where hair sprays, spray detergents, chlorine, CAUTION or similar chemicals are used. Do not install the boiler in areas where petrol or other ●...
  • Page 23: Mounting The Boiler To The Wall

    3.2 Mounting the Boiler to the Wall WARNING Navien NCB300 boilers come with an upper mounting bracket that is pre-drilled at 400 mm on center for easy installation on The boiler is heavy. Always lift the unit with assistance. Be ●...
  • Page 24: Installing The System Piping

    For correct installation, the water mains installation must comply with the Water Supply The primary and secondary heat exchangers of the Navien (Water Fittings) Regulations and Scottish Water Byelaws, NCB300 boiler are designed to attain the highest level of together with all other national and/or local regulations heat transfer in a compact design.
  • Page 25: Installing A Domestic Hot Water (Dhw) System

    22°C (number/ml). pr EN ISO 6222 at the time of installation. Navien is not responsible for performance issues of the domestic system by scaling or accumulation of dirt; suitable steps shall be Refer to the following illustration for a typical DHW piping taken by the installer and user to avoid water quality related issues.
  • Page 26: Connecting The Condensate Drain Line

    The condensate pipework must fall at least 50mm per metre away from the boiler, taking the shortest practical route to the The Navien NCB300 boiler creates condensation when it termination point. operates. This condensation has an acidic pH of 3-5. Follow all...
  • Page 27 External Pipework Unheated Internal Areas The use of an externally-run condensate drainage pipe, Internal condensate drainage pipes run in unheated areas such terminating at a suitable foul water discharge point or purpose- as lofts, basements and garages should be treated as external designed soakaway, may be also considered;...
  • Page 28 Description Description Boiler Boiler Visible air break Visible air break 75 mm trap 75 mm trap Soil and vent stack Sink, basin, bath or shower Invert Open end of condensate drainage pipe direct into gully 25 mm min below grating but above water level; end cut at 45° 450 mm minimum up to three storeys Sink lip Minimum internal diameter 19 mm...
  • Page 29 Description Description Condensate discharge pipe from boiler Boiler Pipe size transition point Visible air break Water/weather proof insulation 75 mm trap 43 mm 90° male/female bend Soil and vent stack External rain water pipe into foul water Invert External air break Air gap 450 mm minimum up to three storeys 68 mm ø...
  • Page 30: Pipe Dimensions And Water Pressure

    4.4 Pipe Dimensions and Water Pressure 4.6 Filling the System The requirements recommended for the pipe dimensions and Before filling the boiler pipes, unscrew the air vent cap( ) to ❶ water pressure are as follows: allow the pipes to fill properly. Screw up the cap when the pipes are full.
  • Page 31: Testing The Water System

    4.7 Testing the Water System WARNING Ensure that the boiler is full of water before firing the burner. Operating the unit without filling it will damage the boiler. Such damage is not covered by the warranty, and may result in property damage or severe personal injury. Perform a fill test after installing the boiler’s water system to make sure that the system has been installed properly.
  • Page 32: Connecting The Gas Supply

    5. Connecting the Gas Supply To connect the gas supply: WARNING 1. Connect the gas supply pipe to the connection located on the underside of the appliance. If a gas type other than the one specified on the boiler ● reference plate is used, it could cause a fire or even an 2.
  • Page 33: Gas Pipe Material

    5.1 Gas Pipe Material 5.3 Measuring the Inlet Gas Pressure WARNING WARNING The boiler must be left running for 10 minutes before The boiler cannot function properly without sufficient inlet checking the gas pressure, to obtain thermal equilibrium. gas pressure. Measuring the inlet gas pressure should be performed by a licensed professional only.
  • Page 34 To measure the inlet gas pressure: 5. Loosen the screws indicated in the figure below and connect a manometer to the pressure port. Reset the 1. Shut off the manual gas valve on the gas supply line pipe. manometer to zero before use. Opened Closed Gas Valve...
  • Page 35: Flue System

    6. Flue System 6.1 Flue Terminal Positions WARNING Improper flue of the boiler can result in excessive levels of CAUTION carbon monoxide, which can lead to severe personal injury. Flue should be performed only by a licensed professional. The terminal must be fitted with suitable protection if it ●...
  • Page 36 The minimum distances between the flue exhaust terminal and the building elements must comply with those shown in the following table: Flue outlet positions Window Terminal Position Min. distance (mm) Directly below an opening, air brick, windows, etc. 300* Below gutters, soil pipes or drain pipes 75*** Below eaves 200***...
  • Page 37 A terminal must not be sited under a car port roof. Note ● In certain weather conditions the terminal will emit a plume of steam. If possible avoid positioning the terminal where this ● may cause a nuisance, i.e. positions A, D, G, H, J or M. The flue terminal must be exposed to the external air and the position must allow the free passage of air across it at all times.
  • Page 38 Plume Management The appliance produces a plume of condensate, which can be seen in colder weather. This plume of condensation is harmless, but can be unattractive, particularly in the case of outlets on outside walls. For wall terminals a plume management kit is available as an option. 1000 1200 balcony...
  • Page 39: Flue Installation

    The Navien flue system used is a push fit flue system, ● which does not require screws to be fitted at each flue joint.
  • Page 40 5. Although weather seals can be used, the flue must be installed that prevents lateral movement. The use of sand and cement to seal the flue to the fabric opening of the building would secure the flue as required. The seals can be put over the securing sand and cement as a decorative weather seals.
  • Page 41: Measuring Flue Length

    Carefully study the diagrams representing the different types of removal and select the one that best suits the conditions of your installation. To choose the removal accessories required for each installation, see the list of accessories on the NAVIEN price list. Maximum Total Length Pipe Diameter...
  • Page 42: Terminating The Flue

    6.4 Terminating the Flue Before installing the boiler, determine what type of flue termination is appropriate for the installation location and situation. The subsections that follow describe some typical flue configurations. CAUTION Minimum Clearance to Metering devices and Relief equipment. Maintain a minimum horizontal clearance of 1.22 m from electric meters, gas meters, regulators, and relief equipment.
  • Page 43: Setting The Dip Switches

    7. Setting the DIP Switches DIP SW2 CAUTION Switch Function Setting Do not remove the front cover unless the power to the Reserve boiler is turned off or disconnected. Failure to do so may result in electric shock. Reserve Reserve The boiler has 2 sets of DIP switches on the main circuit board 5&6 Country...
  • Page 44: Connecting Electrical Supplies

    8. Connecting Electrical Supplies 2. Unfasten the 2 latches (at the top) and remove 2 screws (at the bottom) to remove the front cover and gain access to WARNING the internal components. Improperly connecting the electrical supplies can result in electrical shock and electrocution. Follow all applicable electrical codes of the local authority having jurisdiction.
  • Page 45: Connecting The Power Supply Cables

    8.2 Connecting the Power Supply Cables 4. Insert all these elements in the cable gland and press on the lid “A” until the cable is sufficiently fixed in place and the unit To correctly establish the boiler’s electrical connection, follow is sealed.
  • Page 46: Connecting The Switched Live (230V)

    8.3 Connecting the Switched Live (230V) 8.5 Connecting the Outdoor Temperature Sensor The boiler is designed to be connected to a switched live. The switched live cables are to be connected to terminals 1 (AC Live The boiler is designed to be able to function with an outdoor Out) and 2 (Switched Live In) of the boiler terminal strip.
  • Page 47: Connecting The Navien Smart Room Controller (Optional)

    Instead of using your boiler with a generic room thermostat, Instead of using your boiler with a generic room thermostat, you can connect the Navien Smart Room Controller to the boiler you can connect the Navien Room Controller to the boiler.
  • Page 48: Installation Check List

    After installing the boiler, review the following checklist. Complete the boiler start-up process by carrying out the checks listed in the table below. If you have additional questions or need assistance with installation, contact an official Technical Assistance Service (TAS), or refer to the technical support section of Navien’s website (www.navien.co.uk). Check Value measured...
  • Page 49: Operating The Boiler

    10. Operating the Boiler 10.1 Using the Front Panel The front panel allows you to adjust the temperature and view the operating status or error codes. Remove the protective sheet from the front panel before using it. 10.1.1 Icons and Digital Display The icons and digital display on the front panel provide important information required for the boiler’s operation.
  • Page 50 10.1.2 Buttons Using the buttons on the front panel, you can turn on or off the boiler, monitor the current operation status, and set the values required for the boiler’s operation, such as central heating and DHW supply temperatures. Refer to the following table for detailed information. Plus button Menu button Increases the temperature setting,...
  • Page 51: Turning The Boiler On Or Off

    10.2 Turning the Boiler On or Off 2. Press the Plus button ( ) or the Minus button ( ) until desired temperature appears on the display. You can adjust the temperature while the display is flashing. To turn the boiler on or off, press the Power button ( Once the display stops flashing, the temperature setting is stored.
  • Page 52: Resetting The Boiler

    ) to set the CH Heat Demand. Press the ECO button ( ) to The default DHW temperature range is 30°C to save the value. ● 65°C. 1. Navien Thermostat The boiler will retain your settings during a power ● 2. Panel outage. 3. OpenTherm The DHW temperature cannot be adjusted, when ●...
  • Page 53: Accessing Basic Menu Items

    10.6 Accessing Basic Menu Items 10.6.2 Setting the Central Heating Temperature To set the boiler’s central heating operation, press the Menu In the Main Menu screen, you can view the boiler’s operating button ( conditions, configure the central heating and DHW temperatures, and review error history.
  • Page 54 10.6.5 Viewing Error History 10.6.6 Viewing Service Information To view the error history, press the Info button ( ) and the ECO To view the miscellaneous system information, press the Info button ( ) simultaneously for 5 seconds. button ( ) for 5 seconds.
  • Page 55: Accessing Advanced Menu Items

    Press ECO button to enter parameters, ‘PASS’ , press ECO again to Item Description get to the 4 digit code password screen. Fuel Type 17. Gas Type ) or the Minus In the password screen, press the Plus button ( (LNG G20/LPG G30/LPG G31) button ( ) to change numbers and ‘M’...
  • Page 56 Set the central heating minimum heat capacity limit. Set the CH heat demand control type. Setting range: Central heating ● 1. Navien thermostat minimum capacity (%) – 8. CH Min Limit 19. CH Heat Demand 2. panel [central heating minimum 3.
  • Page 57 10.7.3 Setting the Special Operation Modes Press the Info button ( ) to return to the previous screen or menu. To Set the boiler’s operation parameters, press the ECO button ) and Menu button ( ) simultaneously 5 seconds, and Item Description then select “3.
  • Page 58: Error Codes

    10.8 Error Codes When an error code appears on the front panel, refer to the following chart for a definition and possible remedy for the situation. Item Error Code Description Reset E001 Overheating of heat exchanger Manual E003 Ignition failure Manual E004 False flame detection...
  • Page 59: Maintaining The Boiler

    11. Maintaining the Boiler 11.1 Cleaning the Boiler 3. Disconnect the power supply from the boiler. 4. Close the gas valve. CAUTION Make sure the boiler is turned off and the power supply is disconnected before cleaning the boiler. The boiler may remain hot for several minutes after it is turned off.
  • Page 60: Cleaning The Return Adapter Filter

    The water that remains in the plumbing lines CAUTION will drain out. Damage due to freezing is not covered by the Navien limited warranty. If the boiler is connected to a circuit that could freeze, the circuit pipes must be suitably insulated. All pipes installed outdoors must be insulated according to applicable legislation.
  • Page 61: Routine Servicing

    If hot water will not flow and you suspect that the boiler is frozen, follow these steps: Navien advises on an interim service inspection with a flue gas 1. Press the Power button ( ) on the front panel to turn off analyser.
  • Page 62 Checking all Piping for Leaks WARNING Eliminate all system or boiler leaks. Continual fresh makeup water will reduce boiler life. Minerals can build up in sections, Follow the service and maintenance procedures given ● reducing heat transfer, overheating heat exchanger, and causing throughout this manual and in component literature heat exchanger failure.
  • Page 63 Inspecting the Ignition and Flame Detector Electrodes Checking the CO₂ 1. Remove the ignition and flame detector electrodes from the 1. Check the CO₂ readings at full load and low load. boiler heat exchanger. 2. Check the CO readings and combustion performance 2.
  • Page 64 6. Loosen the three screws holding the front panel and remove 1. Press the Power button ( ) on the front panel to turn off the front panel. the boiler. 2. Disconnect the power supply to the boiler. When removing the front panel, label all wires and Note make sure all wires are disconnected.
  • Page 65 8. Remove the screw connecting the fan motor assembly 10. Remove the rubber packing at the top of the cover and put and the mixing chamber, and then remove the fan motor a Phillips screwdriver into the hole, and then loosen the assembly.
  • Page 66 Check that manufacturer’s max. flue lengths Navien recommends to use a hose. have not been exceeded and all guidance has been followed ● (e.g. Gas Safe Technical Bulletin TB008 where chimney/flues If the water pressure of the hose is too high, water ●...
  • Page 67 Start SET BOILER TO MAXIMUM RATE In accordance with boiler instructions, set boiler to operate at maximum rate (full load combustion to stabilise. Do not insert analyser probe during this Note period to avoid possible “flooding” of sensor. CARRY OUT FLUE INTEGRITY CHECK USING ANALYSER Insert analyser probe into air inlet test point and allow readings to stabilise.
  • Page 68 From previous page VERIFY FLUE INTEGRITY Analyser readings indicate that combustion products and inlet air > 20.6% < 0.2% < = less than or > 20.6% equal to > = greater than or < 0.2% equal to CHECK CO AND COMBUSTION RATIO AT MAX. RATE TURN OFF APPLIANCE AND CALL With boiler still set at maximum gas rate, insert analyser probe into ATAG TECHNICAL HELPLINE FOR...
  • Page 69: Appendices

    4. Label all the wires on the PCB. Included Items: 5. Disconnect all the wires. Gas Orifice (refer to below table) ● 6. Loosen the five screws indicated in the figure. Model NCB300-28K Ø5.95 Ø4.75 NCB300-37K Ø6.35 Ø5.05 NCB300-41K Ø6.35 Ø5.05...
  • Page 70 7. Remove the front panel assembly. 10. Once the gas inlet pipe is detached from the gas valve, find location B - the connection above the gas valve where it is attached to the fan motor assembly. Carefully remove the two screws by hand using a Phillips screwdriver and pull the gas inlet pipe away from the fan assembly to access the gas orifice.
  • Page 71 Attempting to alter or measure the gas valve outlet ● pressure could result in damage to the valve, causing Inner Packing potential severe personal injury or substantial property damage. Navien NCB300 boilers are shipped ready to fire Gas Orifice natural gas only. Outer Packing Inner Packing...
  • Page 72 DANGER DANGER See Figure 5. Inspect the Outer packing between the venturi When conversion is required, be sure to set the front ● and gas valve inlet adapter whenever they are disassembled. panel DIP switches according to the supply gas type. The Outer packing must be in good condition and must be Failure to properly set the DIP switches could cause installed.
  • Page 73 This must be removed first. Gas type [20 mbar] [37 mbar] Model Output Consumption Gas flow Gas flow Load Kcal/h Max. 20,640 24.0 24.7 2.30 0.993 NCB300-28K Min. 3,700 0.40 0.173 Max. 22,360 26.0 26.8 2.490 1.077 NCB300-37K NCB300-41K Min. 3,870 0.430 0.185...
  • Page 74: Wiring Diagram

    12.2 Wiring Diagram BLDC FAN Valve Outdoor Sensor 8 6 4 2 7 5 3 1 DHW_INPUT CN12 5 4 4 CN14 PUMP 3WAY-Valve PIN1 CN13 Dip s/w 2 3 4 2 3 4 6 7 8 (4pin) BURNER HTL CN15 Dip s/w (8pin)
  • Page 75: Ladder Diagram

    12.3 Ladder Diagram LIVE 240 VAC NEUTRAL FILTER Relay 1 Igniter Relay 2 Circulation Pump Relay 3 3WAY DC15V Transformer BLDC-FAN Primary Speed Control Sencondary AC130 DC30V Trans DC24V DC 9V DC12V DC 5V Flow Sensor Flame rod HTL switch Heat Exchanger Hall Sensor WD-RSS...
  • Page 76: Outdoor Temperature Sensor (Optional)

    12.4 Outdoor Temperature Sensor (Optional) The boiler is designed to be able to function with an outdoor temperature sensor (10kΩ @ 25°C). Connect the sensor cables to the terminals 3 and 4 of the boiler terminal strip. For more information on the boiler terminal strip, refer to “8.5 Connecting the Outdoor Temperature Sensor”...
  • Page 77 Benchmark Commissioning & Warranty Validation Service Record It is a requirement that the boiler is installed and commissioned to the manufacturer’s instructions and the data fields on the commissioning checklist completed in full. To instigate the boiler warranty the boiler needs to be registered with the manufacturer within one month of the installation.
  • Page 78 GAS BOILER SYSTEM COMMISSIONING CHECKLIST & WARRANTY VALIDATION RECORD Address: Boiler make and model: Boiler serial number: Commissioned by (PRINT NAME): Gas Safe registration number: Company name: Telephone number: Company email: Company address: Commissioning date: Heating and hot water system complies with the appropriate Building Regulations? Optional: Building Regulations Notification Number (if applicable): Time, temperature control and boiler interlock provided for central heating and hot water Boiler Plus requirements (tick the appropriate box(s))
  • Page 79 SERVICE & INTERIM BOILER WORK RECORD It is recommended that your boiler and heating system are regularly serviced and maintained, in line with manufacturers’ instructions, and that the appropriate service / interim work record is completed. Service provider When completing a service record (as below), please ensure you have carried out the service as described in the manufacturers’ instructions. Always use the manufacturers specified spare parts.
  • Page 80 SERVICE & INTERIM BOILER WORK RECORD It is recommended that your boiler and heating system are regularly serviced and maintained, in line with manufacturers’ instructions, and that the appropriate service / interim work record is completed. Service provider When completing a service record (as below), please ensure you have carried out the service as described in the manufacturers’ instructions. Always use the manufacturers specified spare parts.
  • Page 81 Memo...
  • Page 82 Memo...

This manual is also suitable for:

Ncb300-37kNcb300-41k

Table of Contents