Download Print this page

Redx RX-2505AC Quick Installation Manual page 4

Hide thumbs Also See for RX-2505AC:

Advertisement

On/Off grid installation
1
5
L=E+(2~3) mm
E
2
3
6
Nut
4
8
1
DRM0 Installation
1
Network
Cable
RJ45
Connector
Waterproof Sealing
Ring
RJ45
Connector
Connection Plate
Waterproof Sealing Rings
GRID L
GRID N
GRID PE
Nut
EPS L
EPS N
EPS PE
7
Nut
9
M4
1.5 N.M
2
1
2
1
2
3
R J45
4
5
6
7
8
Pre - Operation Inspection
Checking Items
The installation location meets the requirement.
The system has been securely installed.
Sufficient space for heat dissipation. No objects are left in the system.
System wiring is correct and firm. Refer to 240V diagram for more information.
Cables are properly installed and well protected without any damage.
The selection of AC circuit breaker meets local standard.
All terminals have been sealed.
Warning labels are not covered without alteration or occlusion.
Operation
Following the steps to start the system.
Step
: Connect to the grid.
Step
: Turn on the battery isolation circuit breaker.
Step
: Turn on the power button.
Step
: Download the Redx Power App, QR Code for App download is on flip side of the document
Step ⑤ : Complete all steps in the App instructions.
LED Status
RUN
VPP
Operating
status
GRID
BAT
BATT
If the startup fails, refer to "Troubleshooting" in the user manual. For details about
LED indicators, refer to the user manual.
Result
YES
Operation----Green
RUN
Fault----Red
Monitoring ----Green(Flash)
VPP
Remote Control ----Blue(Flash)
Grid ----Green
GRID
No Grid ----Blue
Charge---Green
BAT
Discharge---Blue
SOC
Battery Capacity
Notice
NO

Advertisement

loading