RX - 2505PW
All-In-One Energy Storage System
www.redxenergy.com.au
This document is subject to change from time to time due to product upgrades or other reasons.
This document is not a substitute for the user manual or safety instructions.
Please read the user manual and related standards before undertaking any operation or
commissioning. Please take time to access http: //www.redxenergy.com.au or scan the QR code for
the latest quick installation guide.
Prior to commencement, check whether the goods match the packing list, if there is any damage
to any items or components missing, please contact the Distributor / Dealer or Redx.
The power cables must be intact and well insulated. Please use insulating gloves and wear personal
protective equipment at all times when installing this product.
Failure to comply with any of the above requirements may result in injury to personnel or damage
to equipment.
Redx shall not be liable for any loss of life or damage caused by failure to comply with the
requirements of this document and user manual.
Safety Statement
Danger
Shock hazard!
Exposure to sunlight and the elements are not recommended.
All electrical connections must meet local and national electrical standards.
Only connect the system to the grid with local authority approval .
Warranty will be void if the cover is removed. Improper opening of the unit may also result in
serious electrical shock or injury to personnel.
Warning
All safety labels, warning labels, and nameplates must be clear and visible and cannot be
removed or overwritten.
Warning
Hot surface!
Inverter module may become hot after extended period of operation. Allow time for inverter
to cool before touching!
Notice
The country setting and protection parameters must be set by professional personnel based
on local power grid standards.
Incorrect country settings may affect the operation failure to meet the local standard.
Warning Label
Disconnect all external power supplies before
maintainace.
Hot surfaces!
Device only has high voltage on AC input and
Read the instructions before
AC output. professional and qualified technicians
operation.
are not required to install this unit.
Wait for 5 minutes before touching the internal conductive components after system
turn off and disconnected from grid.
5min
Packing List
RX-2505PW
1PCS
RJ45
1PCS
M6 bolts
8PCS
Bracket
1PCS
Hole template
4 Pin CT
Document
M5 lugs
CT
M4
5PCS
1PCS
1PCS
connector
1PCS
This drawing is for reference only. Please refer to the actual product.
Installation Location
≥300mm
Dimension
145
600
1PCS
1PCS
http:// www.redxenergy.com.au
≥300mm
APP Download
The size and parameters of the product are subject to change without notice.

Advertisement

loading

Summary of Contents for Redx RX-2505PW

  • Page 1 Failure to comply with any of the above requirements may result in injury to personnel or damage to equipment. 4 Pin CT Redx shall not be liable for any loss of life or damage caused by failure to comply with the Document M5 lugs...
  • Page 2 Connector Step ④ : Download the Redx Power App, QR code for App download is on flip side of document Step ⑤ : Complete all steps in the App instructions. This figure is for reference only, please refer to the actual product!
  • Page 3 四折页尺寸: 566*209mm 材质/克重: 200g铜版纸 四色正反印 四折页...