Prerequisites For Operation And Maintenance - ABB PT003924 Operation Manual

Low-pressure stage
Table of Contents

Advertisement

Operation Manual / Power2 340-H / Low-pressure stage
2 Safety / 2.11 Prerequisites for operation and maintenance
2.11

Prerequisites for operation and maintenance

Responsibility of the operating company
In awareness of its responsibility, the operating company must ensure that only authorised
personnel work on the Power2, who:
¡
Are versed in the general and locally applicable regulations for occupational safety and
accident prevention
¡
Are equipped with the prescribed personal protective equipment
¡
Have read and understood the Operation Manual
¡
Have been instructed in the use of the Power2.
The safety-conscious work of the personnel and adherence to the Operation Manual must be
checked periodically.
Suitable working materials and personal protective equipment must be kept in a perfect
condition.
Only authorised personnel may remain in the vicinity of the Power2 when the engine is run-
ning.
Competence of personnel
The Power2 may only be operated and serviced by trained and authorised personnel. Basic
mechanical training is a prerequisite.
Modifications to the Power2
Modifications to the Power2 must be approved by Turbo Systems.
Original parts and safety
Original parts and accessories have been specially designed by Turbo Systems for the
Power2.
WARNING
Use original parts
Operation of the Power2 with non-original parts can impair the safety of the
Power2 and can cause serious damage to property and injury to personnel.
Only use original parts from Turbo Systems.
u
Turbo Systems accepts no liability for any damage resulting from the use of non-original
parts and corresponding accessories.
© Copyright 2022 ABB. All rights reserved.
HZTL4053_EN
Rev.F
March 2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power2 340-h44

Table of Contents