© Panduit Corp. 2019
3.
OPERATION
3.1
Commissioning
• Check whether finger guard (1) is present
and is sitting firm.
• Check whether the die set (2) is free from
foreign matter.
• Check whether the pneumatic tubing nuts
(3) have been tightened firmly.
• Insert the table clamp (4) into the bore hole
in the tabletop unit and screw tightly to the
worktable.
• Check the compressed-air supply:
min. 4 bar, max. 6 bar filtered air
•
Connect the free connection (5) on
the foot switch to the compressed-air
supply
3.2
Operation
•
Introduce stripped wire with wire-end
ferrules already fitted, at the side (1) or
from the front (2).
•
Press the switch (3), the crimping
process will be triggered.
•
Release the switch (4), the crimped wire
can be removed again (5).
PA29442A01_02_ENG
OPERATING INSTRUCTIONS
Figure 2 - Commissioning
Figure 3 - Operation
Page: 5 of 8
CTFP-25
ENGLISH
3-2019