Emerson SOLAHD S4KC Series Instruction Manual page 19

Industrial on-line ups - 120 v, 700 va - 3000 va
Table of Contents

Advertisement

5. Extend the slide rail assembly by sliding the front member forward until it touches the rack's front vertical rails
(adjustable length: 18–32 inches/457–813 mm). Use two m5 screws to fix each front member onto the front vertical
rails through the installation holes. make sure that slide rail assemblies are at the same mounting height on all four
rack rails, as shown in Figure 10.
M5 Screw
(4 pcs)
Figure 10: Installing front member of each slide rail assembly
6. Fasten rear member and front member together using four m4 screws and four m4 nuts (m4 nuts have been installed
on the rear member before delivery) per slide rail assembly as shown in Figure 11.
Figure 11: Fastening rear member and front member together
Front
Vertical
Pole
Slide
Front
Member
Front member
S4K2UC SEriES USEr mAnUAL | 19
Rear
Member
Rear Member
M4 Screw (8 pcs)
M4 Nut (8 pcs)

Advertisement

Table of Contents
loading

Table of Contents