Download Print this page

Power On System - GE OEC 9800 Installation Procedure

Advertisement

OEC 9800 Installation Procedure

Power ON System

1. Place the C-Arm's keyswitch in the ON position (clock-wise) and then place the Workstation's power switch in the ON
position. Verify that the Workstation and C-Arm complete their software boot and initialization with no errors reported on the
displays.
2. Verify that the Workstation's elapsed time meter is functional.
3. Verify that the cooling fans are operating on both the Workstation and the C-Arm.
Contents
Installation
Service
Schematics
Periodic
16
Illustrated

Advertisement

loading