Start Up And Operation - Leviton MRIDC Owner's Manual

Lighting management systems, lighting unit for mri room lighting applications
Table of Contents

Advertisement

START UP AND OPERATION

Initial Power-up
After the installation is complete, move the dimmer slide switch to the lowest (down) position. Turn on the Main
input circuit breaker. Verify the Dimmer, on/off switch is in the "ON" position and slide the dimmer knob to a
suitable illumination (setting).
The Dimmer switch can be left in the "On" position and the slide knob may always reside at the lowest setting.
Alternatively, the dimmer slide knob may be left at any setting and the dimmer on/off switch can be used at any
time.
Page 15

Advertisement

Table of Contents
loading

Table of Contents