Download Print this page

Daikin RE18MV2S Service Manual page 7

Removal procedure

Advertisement

Si011193
Step
6
Remove the nut and
remove the outdoor fan.
7
Unfasten the 2 hooks.
Release the fan motor
lead wire.
Remove the 4 screws
8
and remove the fan
motor.
Removal Procedure
Procedure
D-cut
Outdoor
fan
Hook
Fan motor
Removal of Outdoor Fan / Fan Motor
Points
When reassembling, fit the
lower hooks into the bottom
frame.
(R15385)
Nut size: M6
Align the
(R15160)
outdoor fan with the D-cut
section of the motor shaft
when reassembling.
(R15161)
M4 × 16
(R15162)
10 mm
(R12236)
mark of the
5

Advertisement

loading
Need help?

Need help?

Do you have a question about the RE18MV2S and is the answer not in the manual?