Download Print this page
Hardlife Utility C2020 Assembly Manual

Hardlife Utility C2020 Assembly Manual

Container shelter
Hide thumbs Also See for C2020:

Advertisement

Quick Links

SHELTER
ASSEMBLYMANUAL
Container Shelter
Model #C2020/W6mx L6mx H2m
Model#C2040/W6mxL12mxH2m

Advertisement

loading

Summary of Contents for Hardlife Utility C2020

  • Page 1 SHELTER ASSEMBLYMANUAL Container Shelter Model #C2020/W6mx L6mx H2m Model#C2040/W6mxL12mxH2m...
  • Page 2: Parts List

    Parts List Part Code Description C2020 C2040 Female square tube base plate used for corner (with screw) Male square tube base plate used for corner (with screw) Square tube at middle (with screw) Three way fitting Four way fitting Top bent tube...
  • Page 3: Specification

    SPECIFICATION Width: 6m Height: 2m Length: 6m/12m IMPORTANT-----READ MANUAL FIRST Improper site preparation, Assembly and Maintenance may invalidate warranty and cause unnecessary and costly mistake. If you have any questions contact your local dealer. For User Friendly assembly we have identified each individual component with the part code as indicated in the parts list.
  • Page 4 A --EQUIPMENT AND TOOLS FOR INSTALLATION 1. Measuring tape 2. String for alignment 3. Step ladder 4. Sledge hammer 5. Wrench 6. Scissors INSTALLATION PROCESS A—BASE INSTALLATION Please refer to the diagram (Figure 1) to place the base plates.
  • Page 5 Figure 1 1. The measure is from center to center of the tubes. Referring to the above diagram and confirm the place of the base plates. ENSURE THAT THE FOUNDATIONS IS SQUARE. 2.Fix the base plate (No. L1/ L2 / R1) and Connecting pieces (No.15) by bolt (No. 16) according to Figure 1.
  • Page 6 3. Insert the Plastic Plug 30*50 mm (No. 12) into the ends of square tube. ( No. L1 & L2 )
  • Page 7 B--FRAME INSTALLATION (C2020) Figure 2 ( C2040) 1. As Figure 2 shown find one piece of Three-way fitting (No. 1), two pieces of Top bent tube (No. 3) and two pieces of Sidewall bent tubes (No. 4). To connect them by Screw M8x70mm (...
  • Page 8 (part code 6)and 1 piece of Top roof purlin (part code 5) between each arch. Then install the third arch into base plate and connect the purlin. By turns the assembly for the frame is finished. C--INSTRUCTION FOR COVERATTACHED (C2020)
  • Page 9 (C2040) Figure 3 (C2020)
  • Page 10 (C2040) Figure 4 (C2020)
  • Page 11 (C2040) Figure 5 Install the Roof Cover NOTE: DO NOT install the cover onto the frame of your building in high wind conditions. A slight breeze is the most advantageous for cover installation. To take advantage of the breeze, pull the cover up over the arches with the breeze blowing in the cover like a sail filled with air.
  • Page 12 end of the Lower tension tubes. NOTE: DO NOT LEAVE THE ROOF COVER UNATTACHED UNDER ANY CIRCUMSTANCES until the final assembly and tightening has been completed The process is quite easy. But some tightening adjustments will be necessary to produce a flat, tensioned roof cover. Please adjust the roof cover every month. Please Note: Please use the tape wrapped around the gap between the steel skeleton after installing.

This manual is also suitable for:

C2040