General Information; Introduction; Control Of Delivery And Storage; Contents Of The Package - Xvent ELEMENTAIR B-MARK I Operation And Installation Instructions Manual

Table of Contents

Advertisement

General information

1.

1.1. Introduction

This document "Installation and Operating Manual" is intended for the Elementair-B-M1 regulator (hereinafter
-
referred to as "the regulator") to continuously control the speed of the EC-motors for the fans. Detailed
familiarisation with this document is important for the correct and safe installation and operation of the
regulator.
Failure to comply with the conditions specified in this document may result in the regulator not working.
-
The regulator may only be mounted and connected by a trained person with the appropriate authorization to
-
connect electrical equipment with suitable tools and means. During the assembly, it is necessary to observe
all the instructions and recommendations in this manual.
For the correct operation and long-term service life of the regulator, it is necessary to prevent access of
-
unauthorized persons and to train the regulator operators according to this document and applicable
legislative regulations.
Documentation must always be available at the location of the controller installation. It is forbidden to
-
intervene in any way in the controller's internal wiring, which does not correspond to the instructions given in
this manual.
Due to the continuous development of our products, we reserve the right to change this manual without prior
-
notice.

1.2. Control of delivery and storage

-
Before starting the installation and before unpacking the regulator from the box, it is necessary to check for
any traces of damage on the packaging. In case of damage to the packaging, please contact your carrier.
-
Check if the product ordered by you is in agreement. After unpacking, check that the regulator and other
components are in order.
-
Please report any non-conformity with the order to the supplier immediately. If an order complaint is not
made immediately after delivery, it will not be taken into account later.
If the regulator is not installed immediately after purchase, it must be stored in an internal, non-condensing
-
environment at temperatures in the range 0 to 40°C.
If the product has been transported at temperatures lower than 0°C, it must be stored after unpacking for at
-
least 2 hours in the working environment where it will be installed.

1.3. Contents of the package

-
Regulator Elementair-B-M1
-
Quick manual + Safety Data Sheet
Name plate
-

1.4. Before start of installation

Before commencing the installation, we recommend to stick the serial plate (normally delivered in the
-
package) to the operating documentation (Quick manual, operating book of the equipment, etc.), which is
subsequently stored for possible later servicing.
Before starting all installation or maintenance work, it is necessary to switch off the power supply and secure
-
the switch against switching it on again.

Dimensions of the regulator

2.
Verze 1 – GBR (11.3.2020)
3
1x
1x
1x
D-502-0168

Advertisement

Table of Contents
loading

This manual is also suitable for:

Elementair e-mark ii

Table of Contents