Removing The Compressor Casing; Fig. 26: Removing The Compressor Casing - ABB PT004162 Operation Manual

Table of Contents

Advertisement

Operation Manual / Power2 845-M / High-pressure stage
9 Disassembly and assembly / 9.6 Removing the compressor casing
9.6

Removing the compressor casing

Fig. 26: Removing the compressor casing
1. Fit bracket (90030) to compressor casing (72000) with screws (90959).
2. Fit one plate (90031) and secure with plate (90032), screw (90656) and nut (90432).
3. Secure lifting gear to swivel lifting eye (90657) and attach compressor casing to crane.
4. Using press-off nuts (61090) and ring spanner (90426), fully press off compressor casing.
5. Move out compressor casing (72000) and put down. When doing this, do not roll com-
pressor casing over the studs or put it down on them.
6. Remove the O-ring (42012).
© Copyright 2022 ABB. All rights reserved.
HZTL4069_EN
Rev.F
March 2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power2 845-m46

Table of Contents